Construction Of Magnetic Circuit Coupled 3-Phased Power Protection Scheme

Project and Seminar Material For Electrical Electronics Engineering EEE

Project and Seminar Material For Electrical Electronics Engineering EEE


Abstract


Many problems has occurred in most homes due to lack of 3-phase power sensor hereby endangering most of the gadgets in homes. Because the sensor allows you to know when a phase is overloaded or faulty, so it sounds a fault alarm so that you can eventually shut phase down by so doing securing electrical properties and gadgets from damaging. This project will help you understand and take any available precaution in taking care of home electrical/gadgets using 3-phase power protection scheme.


Table Of Contents


  • Title page
  • Approval page
  • Dedication
  • Acknowledgement
  • Abstract
  • Table of contents

Chapter One

  • 1.0 Introduction

Chapter Two

  • 2.0 Literature Review

Chapter Three

  • 3.0 Research and Design Methodology
  • 3.1 Research Method
  • 3.2 Block Diagram Of The System
  • 3.4 Circuit Diagram
  • 3.5 Functions Of The Components
  • 3.6 Resistors
  • 3.7 Capacitors
  • 3.8 Transistors

Chapter Four

  • 4.0 Construction and Principle of Operation
  • 4.1 Steps Involved In Building the Circuit

Chapter Five

  • 5.0 Conclusion
  • Reference

Chapter One


1.0 Introduction

In this project, the core of the system lies in the micro controller which executes a pre-loaded programme downloaded to it.

If the power is “ON” the microcontroller initializes the VDU (Video Display Unit) state to a known state while checking on each phase for contention, its execution proceeds, but if it doesn’t proceed, it initializes a self timed reset, at this stage its goes for sampling. Once the red phase has been sampled and stored. It repeats the same action for the yellow and blue phase storing.

If the controller still detects some imbalance in the content it sends out an enabling signal/sound an alarm to show that one phase is overloaded.

The micro controller is the core for the system fault calculation, in that, it is the action of the tripping circuit in the system.

Also, in this 3-phase sensing, there should be equal number of load in balancing which is proper in wiring, if anything happens along the line there will be phase difference, so if such faults should be allowed for a long time there may be excess power drawn, thereby the system shuts down and if allowed for a long time, it blow/spoils the generation or the generator coil, these components are also sourced and acquired ranging from resistors to integrated circuits in order to make sure that no component is missing and also to make sure that there is effective work done on the circuit and the project in general.


Chapter Five


5.0 Conclusion

In conclusion we now understand the necessity of the magnetic circuit 3-phase power sensor because without the power sensor and the help of the alarm, you cannot know when a phase is faulty or over loaded thereby causing dangerous damages to our electrical appliances and gadgets.


Construction Of Magnetic Circuit Coupled 3-Phased Power Protection Scheme


Project Material Download

3,000 Naira


The complete material will be sent to you in just 2 steps.

Quick & Simple…


Step One Purchase

Make payment of ₦3,000: through USSD Transfer, Bank Mobile App, ATM Transfer, or POS Transfer to:

Access Bank PlcAccount No.: 0811003731
Name: Samphina Academy
Account Type: Current

Or Click Here to pay with Debit Card

FOR CLIENTS OUTSIDE NIGERIA:
Click Here to pay with Debit Card ($15)
GHANA – Make Payment of 60 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

  PAY WITH CRYPTOCURRENCY


Step Two Purchase

Send the following details through Text Message or WhatsApp Messenger | +234-8143831497

  • Payment Details 
  • Email Address 
  • Construction Of Magnetic Circuit Coupled 3-Phased Power Protection Scheme

The complete material will be sent to your email address after receiving your payment information | T & C Apply


  Contact Our Help Desk


You may also like:

⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


Disclaimer


This research material “Construction Of Magnetic Circuit Coupled 3-Phased Power Protection Scheme” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “Construction Of Magnetic Circuit Coupled 3-Phased Power Protection Scheme” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.