Evaluation Of Project Risk And The Determination Of Contingency Sum For Building Developments In Nigeria

Project and Seminar Material for Building Technology BT

Evaluation Of Project Risk And The Determination Of Contingency Sum For Building Developments In Nigeria


Abstract


The construction industry is characterised with inherent risk and uncertainties as a result of its fragmented and competitive nature. This therefore makes it difficult to accurately estimate the cost of construction project. To achieve the objective of having work completed most especially within cost and quality, contingency sum is apportioned to cater for unforeseen items of work that may likely evolve. Therefore, this current study aims at evaluating project risks with a view to determining adequate contingency funds to improve project performance. A quantitative approach was used in obtaining data through structured questionnaires administered to the construction professionals practicing in the F.C.T.

Abuja as well as survey pro forma to gather archival data on completed building projects. 402 questionnaires were returned (44.4% response rate) and found useful for further analysis and 47 projects were also considered suitable for the study. The data were analysed using Relative important index (RII), Severity Index (SI), correlation and regression analysis. The study revealed that deterministic method (percentage addition to base estimates) was the most commonly used method, contingency sum usually allocated to construction projects are inadequate and that other risk factors are not being considered in its allocation.

The study concludes that contingency sum determination was insignificantly related to the perceived level of inherent risk (R2= 7%) in construction project; and also has a weak relationship with the cost overrun. Based on this, more scientific approach to estimating contingency sum should be employed instead of the experiential approach that often results into under or over estimation of construction cost and estimating professionals should pay greater attention to the effects of economic and environmental risk factors in allocating contingency sum.


Chapter One


Introduction

1.1 Background of the Study

Construction by its nature involves certain unavoidable risks. There are many variables affecting the outcome of a building project especially its final cost. Contractors are required to accept a certain level of risk due to unforeseen costs that are incurred during construction. Risk is also a thing of concern for clients (Mak and Picken, 2000). To account for the various risk that lead to cost increase, many owners and contractors allocate a contingency amount to each project.

Project owners allocate contingency fund to the budgets for proposed projects, while contractors attach a contingency amount to all their submitted bids. Ford (2002) postulates that, project budgets are one of the most important and widely used project management tools. Project complexity and the inherent uncertainty of the financial performance of constructed facilities, development funding, and the control of costs and schedule makes exact budget needs impossible to forecast accurately.

These characteristics also cause projects to deviate from plans. In the same vein, Akintoye and Fitzgerald (2000) identified the causes of inaccuracy in cost estimation, as lack of practical knowledge of construction process by those responsible for estimating function, insufficient time to prepare cost estimates, poor tender documentation, wide variability of sub-contractors price, change in owners requirements, poor communication between the estimating team and construction team. Cost estimation is particularly difficult in the construction industry, often leading to considerable cost overruns that are explained by large uncertainties and uniqueness of projects (Bukeret al).


Evaluation Of Project Risk And The Determination Of Contingency Sum For Building Developments In Nigeria


Project Material Download

3,000 Naira


The complete material will be sent to you in just 2 steps.

Quick & Simple…


Step One Purchase

Make payment of ₦3,000: through USSD Transfer, Bank Mobile App, ATM Transfer, or POS Transfer to:

Access Bank PlcAccount No.: 0811003731
Name: Samphina Academy
Account Type: Current

Or Click Here to pay with Debit Card

FOR CLIENTS OUTSIDE NIGERIA:
Click Here to pay with Debit Card ($15)
GHANA – Make Payment of 60 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

  PAY WITH CRYPTOCURRENCY


Step Two Purchase

Send the following details through Text Message or WhatsApp Messenger | +234-8143831497

  • Payment Details 
  • Email Address 
  • Evaluation Of Project Risk And The Determination Of Contingency Sum For Building Developments In Nigeria

The complete material will be sent to your email address after receiving your payment information | T & C Apply


  Contact Our Help Desk


You may also like:

⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


Disclaimer


This research material “Evaluation Of Project Risk And The Determination Of Contingency Sum For Building Developments In Nigeria” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “Evaluation Of Project Risk And The Determination Of Contingency Sum For Building Developments In Nigeria” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.