The Impact Of Non-Financial Incentives On Bricklayers Productivity In Nigeria

Project and Seminar Material for Building Technology BT

The Impact Of Non-Financial Incentives On Bricklayers Productivity In Nigeria


Abstract


High productivity is regarded as a goal that ensures long-term survival of firms. In Nigeria’s labour-intensive construction industry, firms are currently applying various non-financial incentive schemes aimed at improving operatives’ productivity. In light of this, the aim of this study was to examine the impact of non-financial incentives on bricklayers’ productivity in Nigeria. A questionnaire survey involving the management and operatives of construction firms was conducted to determine the impact of this scheme on the productivity of bricklayers. The survey was complemented with on-site observation and measurement of bricklayers’ output on 40 construction projects in order to determine the impact of non-financial incentive schemes on productivity. Comparative analysis of sites with and without incentives showed that non-financial incentive schemes significantly improved bricklayers’ productive time and these schemes accounted for 6% to 26% of the variations in output between the two sets of sites on block laying and concreting activities measured.


Table Of Content


Preliminary Page(s)

  • Title
  • Declaration
  • Approval
  • Dedication
  • Acknowledgement
  • Abstract
  • Table of Content

Chapter One

1.0 Introduction

  • 1.1 Background To The Study
  • 1.2 Statement Of The Problem
  • 1.3 Objectives Of The Study
  • 1.4 Significance Of The Study

Chapter Two

2.0 Literature Review

  • 2.1 Conceptual Review
  • 2.2 Concept Of Motivation
  • 2.3 Theoretical Framework
  • 2.3.1 Hierarchy Of Needs Theory
  • 2.3.2 Erg Theory
  • 2.3.3 Mc-Clelland’s Acquired Needs Theory
  • 2.4 Empirical Literature

Chapter Three

3.0 Research Methodology

  • 3.1 Research Design
  • 3.2 Instrument For Data Collection
  • 3.3 Sample And Sampling Technique
  • 3.4 Method Of Data Collection
  • 3.5 Method Of Data Analysis

Chapter Four

4.0 Results And Discussion

  • 4.1 Results
  • 4.2 Discussion

Chapter Five

5.0 Conclusion And Recommendation

  • 5.1 Conclusion
  • 5.2 Recommendation
  • References

Chapter One


1.0 Introduction

1.1 Background To The Study

The construction industry in Nigeria is labour intensive; and it is the highest employer of the nation’s work force. The industry also accounts for over 50% of the country’s gross capital formation. Unfortunately most empirical studies have revealed that the output of the industry is quite low when compared with many developed countries. Workers’ productivity on construction sites has been shown to be very poor and this has been the trend for a long time (Olubodun, 1986 and Ayandele, 1996).

Parts of the reasons adduced for this low productivity as given by Wahab (1977) are:

  • Substantial rise in the demand thrust on the industry in the 1970’s and early 1980’s as a result of unprecedented increase in revenue from petroleum resources.
  • Short supply of both man power and building materials.
  • Complexity involved in the construction process.
  • Enervating weather condition.
  • Ineffective supervision.
  • Absenteeism on a prolonged scale.

In the same vein, Ogunlana and Olomolaiye (1992), noted that on the average, workers spend approximately half of their working day, after allowing for lunch breaks and absences on productive work; while the remaining time is not spent directly on production but rather on waiting, receiving instructions and idling. Nwachukwu (1988), also observed that a large number of project managers and supervisors do not know how to identify operatives’ goals and link them with organizational reward in order to motivate operatives. As a result, operatives get frustrated and productivity suffers.

Khan (1993), reported that the importance of human factors in management, including motivation in terms of provision of incentive schemes, was not well recognized until the famous Hawthorne studies were conducted in 1920’s and early 1930’s. The major implication of the Hawthorne studies was a change in management thinking that the work environment, the feeling of being part of something important and the satisfaction of having some control on one’s own destiny could have a significant influence on productivity.

Ayandele (1996), categorized the variety of methods in which workers are motivated as fear of the supervisor and fear of losing a job, being part of the work itself, incentives, job satisfaction and discipline in terms of high site morale. Olomolaiye (1990), in his study on bricklayers’ motivation in the United Kingdom con- cluded that motivation does not influence the rate of working. According to him, what influences or deter- mines how fast a worker produces is more of a function of his equipment and skill.

Olomolaiye and Price (1989), argued that construc- tion work contains some inherent intrinsic motivators. According to them in order to motivate workers, the management should provide a congenial working cli- mate for motivators such as the work itself, feelings of accomplishment by the worker and recognition for efforts. They went further to assert that pay is a lower level motivator and should not be treated as a prime motivator. Adams (1963), proposed his equity theory of motivation, which is based on equal treatment of people. According to him, people in any organization have a tendency to compare their inputs and corres- ponding rewards with other people in the same rganiza- tion or even in other organizations. People compare their inputs in terms of education, experience, ability, effort and loyalty while they compare their rewards in terms of salary, promotion, recognition and social rela- tionship. If a person feels under rewarded in com- parison to others, the productivity of the person may go down and even he or she may quit the job. On the other hand, a person that feels over rewarded may get motivated and contribute more. Khan (1993) also reported that Skinner in 1953 advocated that monetary or non-monetary incentives (praise, recognition, pro- motion etc) after a desired behaviour increase the probability of the repetition of the desired behaviour. Whereas, punishment (disciplinary measures, fines etc) after an undesired behaviour decreases the probability of the repetition of the undesired behaviour.

A number of studies (Maloney, 1983; Borcherding 1976; Choromokos and Mckee, 1981; Borcherding et al., 1982 and Callahan, 1984), have implicitly attri- buted low labour productivity to the presence of a number of demotivators (dissatisfiers). According to Koehn and Cook (1987), motivators (job enrichment) cannot manifest in improved productivity unless these demotivators are removed. Adeyemi (2000b) observed the presence of a number of demotivators in the Nigerian construction industry, which are clogs to pro- ductivity improvement. Those having direct bearing with operatives’ motivation are identified as:

  • Inappropriate tools and equipment breakdown.
  • Materials shortage, delay and wastage.
  • Incessant rework and estimating errors.
  • Absence of training and safety programmes.
  • Job insecurity/employee turn over.
  • Non –involvement of construction crews in production objectives.
  • Incompetent foremen.
  • Predominance of Maslow’s theory X site managers.

The objective of this study is to determine the extent to which the current non-financial incentive schemes being operated by Nigerian contractors have influenced the productivity of a category of operatives-the brick- layers against the presence of these demotivators.


1.2 Statement Of The Problem

The primary reason for this study is to examine the impact of non-financial incentives on Bricklayers productivity in Nigeria. Also, this study seeks to bring to light the fact that the construction industry indeed implements other than money, non- monetary incentives in motivating their staff. Besides, in this study the application of these incentives and how they have actually improved on workers’ productivity is given due attention. The study also brings to the fore specific non-monetary incentives used by the management of construction companies in their quest for employee motivation geared at enhancing employee productivity. The researcher is particularly concerned whether indeed other than money, there are other incentives put in place by construction companies to motivate the workers. Besides, whether or not those non-monetary incentives have enhanced performance of the employees particularly in bringing about increased productivity of employees, their commitment to work, punctuality to mention but a few.


1.3 Objectives Of The Study

The objective of this study is to determine the impact of t non-financial incentives on bricklayers’ productivity in Nigeria. Consequently upon the research problem stated above, the following research questions are considered pertinent:

  1. Are there functional non-financial incentives for bricklayers in the construction industry?
  2. How has non-financial incentives affected bricklayers in the construction industry?
  3. How related are non-financial incentives and bricklayers productivity?
  4. What specific non-financial incentives have been adopted by the construction industry so far?

1.4 Significance Of The Study

This study brings light to the effect if financial and non-financial incentives on staff performance in organization, specifically among bricklayers in the construction industry. The study may therefore be beneficial to the organization under study in the area of policy formulations regarding incentive schemes and remuneration. To education, the study may contribute to already existing knowledge on the impact of financial ad non-financial incentives on workers’ productivity. Finally, to those in academics and human resource researches, the study may serve as a springboard for further investigations.


Chapter Five


5.0 Conclusion And Recommendation

5.1 Conclusion

An analysis of the impacts of non-financial incentive schemes being operated by some contractors in Nigeria on bricklayers’ productivity has been performed. The study concludes that:

  1. Non-financial incentive schemes are preferred as methods of motivating operatives in the Nigerian construction industry than financial incentive schemes.
  2. The premium placed on variables of non- financial incentive schemes differ significantly across firm categories. This premium decreases from large firms to small firms. In addition small firms are more interested in non-financial incentive schemes that do not involve initial capital outlay.
  3. The management of all categories of construction firms in Nigeria are the major initiator of incentive schemes and their emphasis is placed on schemes corresponding to Herzberg’s hygiene factors.
  4. Application of non-financial incentive schemes increases the productive time of bricklayers and consequently enhances productivity. These schemes are responsible for 6 to 26% increase in outputs on bricklaying and concreting activities measured on site.

5.2 Recommendation

Based on the findings of the study, the following were recommended;

  1. Since non-financial incentive schemes are preferred as methods of motivating operatives in the Nigerian construction industry than financial incentive schemes, construction companies should emphasize these incentive schemes to increase motivation, morale and productivity.
  2. The management of all categories of construction firms in Nigeria should also ensure compliance and innovation in terms of initiating of non-financial incentive schemes to increase productivity

Get Complete Project Material

5,000 5000

The Complete Material Will Be Sent to You in Just 2 Steps

Quick & Simple…


Step One Purchase

Make Payment (Through Transfer) of ₦5,000 to the Account Below

Zenith BankAcc No: 1225513212
Samphina Academy
Current Account

Or CLICK HERE To Pay With Debit Card


FOR STUDENTS OUTSIDE NIGERIA
CLICK HERE To Purchase Material ($15)

Step Two Purchase

Send the Following Details on WhatsApp ( 08143831497) After Payment

  1. Payment Details

  2. TOPIC: The Impact Of Non-Financial Incentives On Bricklayers Productivity In Nigeria

The Complete Material Will Be Sent To You On WhatsApp After Receiving Your Details
T & C Apply


  Contact Our Help Desk


Need a Different Topic? Perform a Quick Search



List of Related Works

Click on Any Topic to Preview the Content

samphina.academy

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.