A Review On Quantified Impacts Of Construction Labour Productivity Towards Project Performance

Project and Seminar Material for Building Technology BT

A Review On Quantified Impacts Of Construction Labour Productivity Towards Project Performance


Table Contents


  • Approval page
  • Dedication
  • Abstract
  • Acknowledgement
  • Table of content

Chapter One

  • Introduction
  • 1.1 Relevance of project
  • 1.2 Site inspection
  • 1.3 Evolution of road network in Nigeria
  • 1.4 Motor vehicle characteristic that affects road design data
  • 1.5 Drivers and their characteristics
  • 1.6 Reconnaissance survey
  • 1.6.1 Chain survey
  • 1.6.2 Station marking
  • 1.7 Factors Affecting Choice Of Station

Chapter Two

  • Theodolite Transversing Of The Road Control
  • 2.1 Definitions
  • 2.2 The theodolite
  • 2.3 The odorite adjustment
  • 2.3.1 Temporary adjustment
  • 2.3.2 Permanent adjustment
  • 2.4 Procedure for theodolite traversing
  • 2.5 Materials used for the theodolte traversinging

Chapter Three

  • Project Field Leveling Work
  • 3.1 Leveling
  • 3.2 Profile leveling
  • 3.3 Cross leveling
  • 3.4 Objectives of leveling
  • 3.5 Instruments used in leveling
  • 3.6 Temporary adjustment of leveling instrument
  • 3.7 Definition of some leveling terminologies
  • 3.8 Leveling book
  • 3.9 Earthwork computation
  • 3.9.1 Method

Chapter Four

  • Soil Analysis
  • 4.1 Collection and preliminary preparation of samples
  • 4.2 Mechanical analysis
  • 4.3 Atterberg / consistency limit tests
  • 4.3.1 Liquid limit test
  • 4.3.2 Plastic limit test
  • 4.4 Compaction test
  • 4.5 The California bearing ratio (CBR) test
  • 4.6 Pavement design using CBR

Chapter Five

  • Geometric Elements Design
  • 5.1 Basic design parameters
  • 5.1.1 Design speed
  • 5.1.2 Gradient
  • 5.1.3 Sight distance
  • 5.2 Curve design
  • 5.3 Curve parameters and formula used, in designing of horizontal curves
  • 5.4 Vertical curve design
  • 5.5 Cross sectional elements of the road
  • 5.6 Brief description on stages of work and equipment used n road constriction
  • 5.7 Summary and conclusion
  • References

Get Complete Project Material

5,000 5000

The Complete Material Will Be Sent to You in Just 2 Steps

Quick & Simple…


Step One Purchase

Make Payment (Through Transfer) of ₦5,000 to the Account Below

Zenith BankAcc No: 1225513212
Samphina Academy
Current Account

Or CLICK HERE To Pay With Debit Card


FOR STUDENTS OUTSIDE NIGERIA
CLICK HERE To Purchase Material ($15)

Step Two Purchase

Send the Following Details on WhatsApp ( 08143831497) After Payment

  1. Payment Details

  2. TOPIC: A Review On Quantified Impacts Of Construction Labour Productivity Towards Project Performance

The Complete Material Will Be Sent To You On WhatsApp After Receiving Your Details
T & C Apply


  Contact Our Help Desk


Need a Different Topic? Perform a Quick Search



List of Related Works

Click on Any Topic to Preview the Content

samphina.academy

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.