Reliability Evaluation Of Secondary Distribution System In Nigeria

Project and Seminar Material For Electrical Electronics Engineering EEE
Abstract
A power system is set up basically to meet the demands of the customers. However, interruptions which are largely unavoidable contribute to the unavailability of power and thus prevent power system from achieving this. In most cases, it is the sustained interruptions that greatly affect both the utility company and its customers. Hence, it is necessary to find means of determining which component failure contributes most to the unavailability of the distribution system, and how this unavailability actually affects the customers.
This is to enable system planners and designers to seek better ways of improving the reliability of a typical secondary distribution substation system having a single-end fed radial configuration. By using analytical method and network reduction technique, the substation reliability was analyzed based on the outage data gotten from the utility company. The conclusion from this work shows that transformer failure followed by the fuse failure contributes most to the substation’s unavailability. The overall system availability shows that the system’s performance is poor.
Chapter One
Introduction
1.1 Background Of The Study
Electric power system is basically set up to supply electricity with little or no interruptions to its customers. The number of interruptions that occur while the system performs its intended function is part of what determines the overall reliability of the system. The other factor that determines its reliability is the quality of electricity delivered. Furthermore, the capability of a power system to continuously deliver quality electricity means that the customers are satisfied and the electricity providers are having favorable returns on their investment as they continue their business of supplying electricity. As electricity consumption has become an important factor that affects the drive needed for technology to grow and to facilitate the development of modern society, it is very important therefore to take seriously the issue of reliability of an electric power system.
Generation, transmission and distribution are the three subsystems of an electric power system. At the generating station, electricity is generated and transmitted through the high voltage transmission lines to the distribution substations. The distribution substation system considered covers the electrical system between the substation fed by the subtransmission system and the supply line to the consumers’ meters i.e. 11kV to 0.415kV transformation (Theraja and Theraja, 2005). The distribution substations are usually sited relatively near the customers for effective delivery, monitoring and maintenance of the substation and the customer end and are usually referred to as secondary distribution substation system. Distribution systems basically serve as the link from the distribution substation to the customer. Reliable and safe transfer of electricity to the customers covered by the distribution area is ensured by this system and is the main subject studied in this dissertation.
In terms of reliability evaluation and modeling, generating stations have justifiably received more attention than the other systems because they are individually capital intensive. In addition, in the event of generation inadequacy and generation loss there is usually widespread catastrophic effects on the society and environment. It impacts directly on the whole system and even distribution system will not be able to perform its duty because there will be no electricity to supply to customers. However based on published research work and studies, distribution systems have begun to receive moderate attention compared to past decades. In most cases, when there is disturbance in form of failure which results in outages in the distribution system it affects only the localized territory.
Only in few cases does the fault move up in to the system largely as a result of protection failure. Analysis of the customer failure statistics of most electricity companies shows that the distribution system makes the greatest individual contribution to the unavailability of supply to a customer (Gonen, 2014). In effect, the purpose of establishing generating stations and the hurdles overcome to transmit electricity is defeated when it does not get to the user end as a result of distribution system failure. This makes distribution system to be highly important. The distribution systems account for up to 90% of all customer reliability problems, improving distribution reliability is the key to improving customer reliability (Billinton and Jonnavithula, 1996).
Meanwhile, as the main aim of a power system is to meet the electricity needs of the customers and this can only be achieved when the components making up the system are performing their intended function properly for as long as the system is in operation, it is important that the demand for electricity and its supply be properly viewed and included in setting up the system. Therefore, due to its high impact on the cost of electricity and its corresponding effect on customer satisfaction, distribution reliability is very important. However, as in any other viable engineering system, there are challenges that face power distribution system which tends to make the system unreliable.
One of these is the issue of serving its main purpose which is to supply quality electricity with little or no interruptions. This problem is inevitable in power systems across the world but the way they are managed is what makes it different from country to country. For instance in the United States, there is nearly an uninterrupted delivery of quality electricity to its numerous customers which makes it rank among the most dependable in the world. It is in management of the power systems that reliability evaluation becomes significant. Reliability evaluation does not in any way make a system more reliable but it helps in system planning and identification of weak components.
1.2 Problem Statement
A distribution substation consists of supply line, power transformer, outgoing feeders, switching device, and protection device to ensure efficient operation. 11/0.415kV substations are common sight on streets and perform the function of distributing power supply to a number of customers in a given neighborhood. The substation is the final stage of electric power distribution system as the circuits leaves the substation at 415V and delivered by three-phase, 4-wire system. The voltage between any two phases is usually lower than the actual 415V and between a phase and neutral is 240Vand most times when measured is less than 230V as a result of voltage drop.
In Nigeria, daily electric power interruption is largely becoming a consistent phenomenon in wide area network of electricity distribution and this is basically due to insufficient power generation, transmission faults and distribution system faults and failures. Unavailability of power supply to customers can occur several times a day and sometimes for weeks and in worst cases for months. There are instances where several interruptions occur in a day especially at the residential loads, which causes untimely failure of home gadgets, darkening of light bulbs, and reduced efficiency and performance of high-power appliances. Damage of electronic devices and burning of light bulbs have also occurred due to over voltages. There are also few cases of deliberate outages due to weather especially rainfall. This is to protect most residential areas from voltage surge that may enter into the power system when lightning occurs owing to the fact that not all residential areas were inspected and certified by the electrical companies when the buildings were completed. Most electrical designs in residential houses are usually not done by professional engineers especially in the middle-class and low-income earner’s settlements.
Considering the fact that the presently installed capacity in Nigeria cannot serve all the customers, it is incumbent that the available power generated be judiciously served with little or no interruptions. That is, when power is generated and available in the system, the distribution subsystem must be up to its task of delivering quality power to the customers. Hence there is the need for the reliability evaluation of a typical distribution substation and its availability.
In the reliability evaluation of power systems, the collection of failure data could be one of the most difficult things because of several reasons (Wang,2012). Hence, one of the reasons the study area is chosen because of access to the data needed for this project. Also, the substation supplies relatively large customers which makes outage in the substation a major concern for both the Power Company (Eko electricity) and customers, Ayetoro 1 Substation, Aguda . In addition, the features of the substation is as highlighted below and can be found in many other substations which have been in service for more than 10 years across the country.
- It’s an outdoor substation with overhead lines and transformers mounted on the ground. Thereby, exposing most of the components to different weather conditions.
- The HRC fuse that serves as major protection device for the transformer has been replaced with copper strands which are easily replaceable. The size of the strand is usually determined by the utility technical workers.
- It has relatively large number of customers of which some cannot be accounted for when billing is done.
- Most of the substation components have undergone several repairs due to random failures.
1.3 Aim And Objectives
The aim of this dissertation is to conduct a reliability evaluation of secondary distribution substation system in Nigeria: a case study of Ayetoro 1 substation, Aguda Lagos state.
The specific objectives of the dissertation to drive the above stated aim are to determine
- The reliability of each component in the substation system.
- The overall reliability of the distribution substation.
- How the substation unavailability contributes to the loss of supply to the customers by interpreting the results obtained after analysis.
Chapter Five
Conclusion and Recommendation
5.0 Summary
In this dissertation, Ayetoro 1 substation, Aguda was chosen as a secondary distribution substation to study in order to evaluate the reliability of a typical substation in Nigeria. In order to achieve this, the substation was viewed to be in isolation from the rest of the power system. That is, the effect of insufficient generation was not considered and the impact of transmission subsystem failure which may arise as a result was also not considered. The analysis was carried out using 12 months’ component outage frequency and its duration.
Network reduction method was employed in carrying out the reliability analysis of the substation. The substation has only one failure mode since it is designed as single-end fed radial network system. Hence, failure of a single component is sufficient enough to cause interruption of power supply. The component reliability of the substation was carried out and the result of the analysis showed that transformer contributed most to the cause of interruption to the customers.
From the analysis carried out so far, it has been demonstrated that though the frequency of outage affects reliability but the outage duration has more impact on the system availability. The month of January had the highest number of failures and February had the highest duration of outages. However, it was the month of February that had higher value for system unavailability throughout the year. This implies that, even if there are failures and faults in a component in the system, it is the duration for which the outage is allowed that greatly impacts the overall system.
Furthermore, the month of December had the highest ASAI value which, though is far below the recent expected value of 0.99989 according to IEEE ASAI standard, shows that the utility company puts concerted effort to ensure that customers enjoy less interruptions in the festive and holiday seasons. This has the advantage of generating more revenue from energy used as the population of electricity users tends to increase at that period. One of the reasons for this high value is that, there were fewer sustained interruptions which imply that component outages were quickly attended to and that the components must have maintained earlier to prevent unplanned interruptions.
5.1 Achievements
This dissertation, by using Ayetoro 1 substation as case study for carrying out reliability evaluation of a secondary distribution system in Nigeria, has been able to identify transformer as the component contributing most to consumer reliability problems followed by the fuse and the outgoing feeder.
Also the overall reliability of the distribution system showed that the substation performance is poor with respect to the standard benchmark. Furthermore, the work shows that consumer reliability is really hampered by the duration of the outages more than the frequency of outages. This is also obvious from the result obtained as component outage duration takes time hence there are fewer interruptions i.e. since the components are out of service there is no way it can fail again.
5.2 Recommendations
Based on the work done in this dissertation, the following recommendations are made:
- The utility company should continue to keep accurate record of interruptions, the causes and durations as these will really help to carry out concise research work.
- Also, efforts should be put in place to see that when there is a component outage, the duration is reduced greatly in order to achieve a more reliable system. And this can be done by ensuring that the customers have a means of reporting outages to the utility company and speedy response whenever outages are reported. This might mean having more hands on deck, i.e. more manpower to sufficiently cover the different areas. Digital monitoring of the substation and lines as it is done for transmission lines and substations is suggested. This may be expensive to implement because there are more secondary distribution substations scattered around a primary distribution network but the benefits cannot be overemphasized. And this can be determined by looking into the reliability cost of the substations if such is to be implemented.
- There should be conscious effort to ensure that duration of outages is reduced to the lowest minimum as possible as this will help improve the reliability of the substation. Reliability is important, but not to be achieved through crooked means like, hastily pushing repairs which may encourage short cuts by the utility workers. Moreover, there is higher probability of making mistakes when the workers are over worked and tired. Hence, it is very important that the utility workers are capable, having the right set of tools, take enough breaks, and follow normal safety precautions for instance working under active lightning should be avoided.
- The customers should be enlightened to see the substation as their property as this will foster quick reportage of failures. This will also aid in protection of the substation from vandals.
- There have been reported cases of customers tampering with the substation components. An example is employing the services of a technician to fix fuse related problems. And in many cases, it has proved to be dangerous as the fuse ratings used are higher in a bid to ensure that there is no loss of supply but this affects the transformers in many cases as through faults.
- The design of the substation can be improved to be a double-end fed radial system to ensure better supply of electricity which automatically improves the reliability of the substation.
- Overloading seems to be a major problem for most distribution substations; hence utility company should have accurate data of their customers. And for newer substations, there must be a major consideration and effective design for more customers as the substation continues to exist. Also, building more customer distribution substations will help reduce the overloading of the transformer.
- Proper and regular inspection of utility facilities like poles will also improve reliability of the substation.


The Complete Material Will Be Sent to You in Just 2 Steps
Quick & Simple…
![]()
Make Payment (Through Transfer) of ₦5,000 to the Account Below
![]() | Acc No: 0811003731 |
| Samphina Academy | |
| Current Account |
Or CLICK HERE To Pay With Debit Card
| FOR STUDENTS OUTSIDE NIGERIA | |
| CLICK HERE To Pay With Card ($15) | |
| FOR GHANA STUDENTS (GHS 100) | |
![]() | MTN MoMo |
| 0553978005 | |
| Douglas Osabutey | |
![]()
Send the Following Details on WhatsApp ( 07062590260 ) After Payment
- Payment Details
- TOPIC: Reliability Evaluation Of Secondary Distribution System In Nigeria
The Complete Material Will Be Sent To You On WhatsApp After Receiving Your Details
T & C Apply
Students Review
List of Related Works
Logistic Of Distribution System In Breweries (A Case Study Of Golden Guinea Breweries)
A Study Of The Product Distribution System In The Brewery Industry
An Assessment Of Distribution System Reliability Of PHCN (A Case Study Of Aba District)
Assessment Of Physical Distribution System Used By Beverage Firms
New Product Distribution System And Customer Patronage Of Food And Beverages Firms
Design And Implementation Of A Cloud Based Lecture Notes (Material) Distribution System
The Impact Of Logistics Of Distribution System On The Growth Of Champion Breweries
Efficient And Reliability Savings Account
Reliability Analysis Of A Prestressed Concrete Beam
Reliability And Power Loss Analysis (A Case Study Of A Power Plant In Nigeria)
Independence Of Auditors And Reliability Of Financial Reports In Banking Industry
Effects Of Internal Control On The Reliability And Accuracy Of The Financial Statement In Bank
Expert System For Mobile Software Reliability
Reliability Analysis Of Reinforced Concrete Bridge Decks Subject To Fatigue