Quality Control As An Effective Tool For Efficient Project Delivery (A Case Study Of Imo State)

Quality Control As An Effective Tool For Efficient Project Delivery (A Case Study Of Imo State)
Abstract
The construction industry has been characterized by improper quality control, inadequate planning and project abandonment. It is important to understand the benefits of quality control identify and reinforce good practice, to achieve this questionnaire was designed and distributed oral interview were made together with literature review.
It has been noted that quality control is averagely adhere to in most construction sites, the use of quacks instead of professional and inadequate supervision has been the major problems inherent in the construction industry today in our country.
Government should make it mandatory that buildings carry certificate of fitness for human habitation. Procurement method in use should be amended to allow professional builders to be more actively involved in the project from the planning, design and construction stages to ensure the build-ability and maintainability of the project.
Table Of Content
Preliminary Page(s)
- Title Page
- Certification
- Approval
- Dedication
- Acknowledgement
- Abstract
- Table of Content
- List of Figures
- List of Tables
Chapter One
1.0 Introduction
- 1.1 Background of Study
- 1.2 Statement of Problems
- 1.3 Aim and Objectives
- 1.4 Justification of the Study (Significant)
- 1.5 Research Question
- 1.6 Delimitation
- 1.7 Limitations
- 1.8 Definition of Terms
Chapter Two
2.0 Literature Review
- 2.1 Quality Control System
- 2.2 Meaning of Quality
- 2.3 Quality Characteristics
- 2.4 How Quality is determined
- 2.5 Quality Plan
- 2.6 Quality Assurance
- 2.7 Quality Audits
- 2.8 Quality Control
- 2.9 Quality Control Tools
- 2.10 Quality Control Measure
- 2.11 Quality Improvement
- 2.11.1 Cost of Quality
- 2.11.2 Leadership
- 2.11.3 Maturity Models
- 2.11.4 Continuous Improvement
- 2.12 Factors that help Quality Control
Chapter Three
3.0 Research Methodology
- 3.1.0 Design of the Study
- 3.1.2 Area of the Study
- 3.1.3 Population of the Study
- 3.1.4 Sampling Techniques
- 3.2.0 Data Collection and Analysis
- 3.2.1 Method of Data Collection
- 3.3 Method of Data Analysis
Chapter Four
4.0 Data Presentation, Analysis
- 4.1 Distribution and Retrieval
- 4.2 Presentation of Data
- 4.3 Discussion of Findings
Chapter Five
5.0 Summary of Findings, Conclusions and Recommendations
- 5.1 Summary of Findings
- 5.2 Conclusion
- 5.3 Recommendations
- Bibliography
- Questionnaire
List Of Figures
- Figure 2.1 Plan, Do, Check and Act (PDCA) Chart
- Figure 2.2 Fishbone Diagram
- Figure 2.3 Pareto Chart
- Figure 2.4 Control Chart
List Of Tables
- Table 1. Quality of Workmanship
- Table 2. Standard of Materials Used
- Table 3. Building Considered for quality Control
- Table 4. Factors Responsible for Building Failure
- Table 5. Ratings of Building Standard
- Table 6. Organizing of Training Programme
- Table 7. Adequate Supervision
- Table 8. Specification
- Table 9. Use of Incentive
- Table 10. Efficiency of Supervisors
- Table 11. How can Quality be affected
Chapter One
1.0 Introduction
1.1 Background Of The Study
This research works deals on harnessing the intricacies of effective quality control of a project towards achieving a meaningful and more efficient project delivery.
However, this work is out rightly concerned with the examination of certain managerial tools and techniques that are quite necessary in devising how to coordinate all of the activities that go on in a given project; developing a realistic schedule, controlling and monitoring the progress of the entire given project.
It is also written to improve the standard of services provided to the client and beneficiaries through the implementation of quality control into the project.
However, quality control costs can be reduced by the inspection of variables in the production process; these include the raw-materials, materials that go into the production processes, work in progress and the machinery used.
1.2 Statement Of The Problems
Lack of adequate planning and supervision have posed many critical problems to the construction, manufacturing industry and other works of life, which has resulted into incessant project delivery which is becoming very predominant in our country Nigeria. Meanwhile from the research carried out on this context the following problems were identified and stated below:
- Improper assessment of tender documents
- Poor resource allocation
- Poor material selection
- The inability of the project team to adhere to standard.
- Lack of training of personnel
- Improper planning, schedule and activity definition
- Improper record keeping and documentation
- Ineffective leadership and control
1.3 Aim And Objectives Of The Study
The thesis is aimed at gaining a better understanding of the benefits of quality control, identify and reinforce good practice. Critically reviewing the process of quality control in a project planning, programming and its techniques. Which enable the project team to organize their work to meet the classic triple project constraints for efficient project delivery.
The objectives of the study comprise of the following:
- To maintain quality standard
- To ensure customer’s satisfaction
- To reduce the costs associated with scrap
- Influence of government policy on execution of project.
- Project monitoring and controlling.
- Causes of unsatisfactory project delivery
- Importance of effective planning and supervision
1.4 Justification Of The Study (Significance)
This research is deemed necessary because it provides the most economic and effective means of achieving maximum and acceptable standard for a give-project through quality management of the available resources and materials.
It is to help organizations to identify and harmonize overlapping regulatory demands interdependencies that cannot be seen using spreadsheets and gives stakeholders transparency and visibility; while guaranteeing that the management process is implemented with a quality punch.
The research will also provide an analytical technique for resource allocation to ensure that the project is completed within finite resource limit. And will benefit the manufacturing industries, construction and construction management oriented firms.
1.5 Research Questions
In other to carry out this research work effectively, the researcher is here by guided by the following questions.
- What are the elements of quality control?
- How does government policy affect quality control?
- What are project delivery constraints?
- What are the effects of not implementing quality control on any given project?
1.6 Delimitation
This report or research study is delimited on the general procedure of quality control in project using different quality control elements or tools to achieve efficient project delivery. The various sections from which information was elicited from contractors, professionals in building industry, clients, beneficiaries, and other stakeholders.
1.7 Limitations
It is obvious that research work cannot be carried out without much difficulty in the study whereby the research topic was limited to construction industry alone. Among the problems encountered were financial constraints, obtaining information from contractors whose work failed and inadequate statistical data on number of construction works that had failed in Imo State.
1.8 Definition Of Terms
Quality:
Is the totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs
Quality Characteristics:
It relates to the attributes measures and methods attached to that particular product or service.
Quality Plan:
This describes the conditions that the services and materials must possess in order to satisfy the needs and expectations of the project stakeholders.
Quality Assurance:
Is a process to provide confirmation based on evidence to ensure to the client, beneficiaries, organization management and other stakeholders that product or services meet expected needs and other requirements.
Quality Audits:
These are structured reviews of the quality management activities that help identity lessons learned that can improve the performance on current or future project activities.
Quality Control:
It is the use of techniques and activities that compare actual quality performance with goals and define appropriate action in response to a shortfall.
Quality Improvement:
It is referred to the application of methods and tools to close the gap between current and expected levels of quality by understanding and addressing system deficiencies and strengths to improve, or in some cases redesign project processes.
Cost Of Quality:
It is the sum of costs a project will spend to prevent poor quality and any other costs incurred as a result of outputs of poor quality.
Poor Quality:
It is the waste, errors, or failure to meet stakeholder needs and project requirements.
Chapter Five
5.0 Summary Of Findings, Conclusions And Recommendations
5.1 Summary Of Findings
It has been noted that quality control is averagely adhere to in most construction sites, the use of quacks instead of professionals and skilled workmen, uses of poor or defective materials for construction and no adequate supervision has lead to a lot of problems inherent in the construction industry today.
5.2 Conclusion
It has been observed based on the results of this research that quality should be clearly defined within the construction team.
Inadequate quality control of construction projects are the major cause of delay in completion of project, which can also lead to abandonment of it.
It is therefore important that all the personnel involved in the project use the quality control techniques during planning and construction process of projects.
Effective quality supervision technique should be incorporated during work supervision to achieve a successful and efficient project delivery.
Quality is very difficult to achieve but with the full cooperation and leasing together of all the professions and craft men involved in the construction industry Ninety Five (95%) percent of quality can be achieved.
5.3 Recommendations
From the foregoing exposition, it is evident that the knowledge and active of building construction requires at least a medium to near perfection skills than what’s obtainable in our society today. Hence incidents of building failures non-quality control in projects shall remain inevitable unless the underlying recommendations are given urgent attention.
- The activities of work registration Broad should be re-examined to ensure that only professional qualified builders/civil Engineers with reasonable years of working experience are registered in various categories to undertake building/civil engineering projects.
- Builders with outstanding years of construction practice should be involved during design stage of construction project, as their invaluable advice would lead to an economic design and save reasonable amount of money that may arise due to variation of site condition.
- Varied climatic conditions, locations and cultural differences should be reflected in our designs. Thus having design in the southern cities would obviously be different from those in Northern cities for varying socio-cultural background of the people and different climatologically consideration.
- Project development information documents should henceforth include appropriate environmental impact assessment report as well as feasibility, viability and geo-technical studies reports.
- Procurement method in use should be amended to allow professional builders to be more actively involved in the project from the planning through design and construction stages to ensure that the “construction dimension” is incorporated into the project package to guarantee buildability and maintainability.
- Government should make it mandatory that buildings carry certificate of fitness for human habitation jointly signed by architect, structural Engineer and Builder before it is deemed to have been completed.
I share the belief that strict adherence to the above listed recommendations would minimize the ugly and dangerous incidents of building failure and promote the realization of reasonable value of the huge naira note to building and infrastructure development.


The Complete Material Will Be Sent to You in Just 2 Steps
Quick & Simple…
![]()
Make Payment (Through Transfer) of ₦5,000 to the Account Below
![]() | Acc No: 0811003731 |
| Samphina Academy | |
| Current Account |
Or CLICK HERE To Pay With Debit Card
| FOR STUDENTS OUTSIDE NIGERIA | |
| CLICK HERE To Pay With Card ($15) | |
| FOR GHANA STUDENTS (GHS 100) | |
![]() | MTN MoMo |
| 0553978005 | |
| Douglas Osabutey | |
![]()
Send the Following Details on WhatsApp ( 07062590260 ) After Payment
- Payment Details
- TOPIC: Quality Control As An Effective Tool For Efficient Project Delivery (A Case Study Of Imo State)
The Complete Material Will Be Sent To You On WhatsApp After Receiving Your Details
T & C Apply
Students Review
List of Related Works
The Effect Of Fluctuations And Variations In Construction Project Delivery
Factors Affecting The Competence And Project Delivery Of Small Indigenous Construction Firms
Sustainable Building Materials And Effective Project Delivery In Kwara State Construction Company
Appraisal Of The Impact Of Delays In Project Delivery In Construction Industry
Plant Resource Control As An Effective Tool To Project Delivery In Building Industry
Assessment Of The Impact Of Poor Communication On Construction Project Delivery
Delay On Construction Project Delivery In Nigeria: Effect, Causes And Solutions
Impact Of Material Management On Project Delivery And Productivity Of An Organization
The Study Of The Various Incentive Scheme That Increase Productivity And Project Delivery
Assessment Of Materials Management Strategies On Project Cost In Lagos State
The Impact Of Budgeting And Budgetary Control In Construction Project Delivery In Nigeria
Impact Of Effective Building Production Management In Successful Building Project Delivery
Project Planning And Programming As Tools For Effective Project Delivery
Planning And Implementation Of Quality Control In A Manufacturing Company
Quality Control Analysis Of Some Commercial Detergent Sold
Inspectorate Service Of Education Unit And Quality Control In Education
Professional Independence And Quality Control In Audit Practice Of Selected Accounting Firms
Role Of Quality Control And Inspection In Consumer Satisfaction In A Manufacturing Firm
Expert System Application In Quality Control And Monitoring (A Case Study Of P Z Company, Aba)
The Effect Of Product Quality Control On Customer’s Satisfaction (A Case Study Of Cadbury Nig. Plc)
The Important Of Quality Control Methods On Employee Performance Within The Hospitality Industry
Design And Implementation Of A Computerized Quality Control System For A Manufacturing Organisation
Design And Implementation Of A Software Based Quality Control System
The Lack Of Quality Control And Scientific Evidence For The Efficacy And Safety Of Medicinal Plants
Production And Evaluation Of Foot Balm
Evaluation Of The Need For Quality Control And Inspection In An Organization
Need For Quality Control And Inspection In An Organization
Problems And Prospects Of Quality Control In Manufacturing Firms
Quality Control And Students Academic Performance In Secondary School
Quality Control As A Good Teacher (Case Study Some Selected Secondary School Area)
Frequently Asked Questions
How do you control the quality of a project?
Control the quality Ensure the deliverables are correct and free of defects and focus on quality from the beginning to the end of the project. Perform inspections to identify defects. Start as early as possible; identifying and correcting defects close to the point of origin saves time and money.
What are quality management and control tools?
Quality management and control tools include different diagrammatic techniques which aid in discovering ideas, help make decisions, and prioritize issues. Learn Quality Assurance from Industry Experts The Difference between Quality Assurance and Quality Control:
What is the importance of quality control and safety in construction?
Quality control and safety represent increasingly important concerns for project managers. Defects or failures in constructed facilities can result in very large costs. Even with minor defects, re-construction may be required and Increased costs and delays are the result.
Who is responsible for quality control in a project?
Quality control should be a primary objective for all the members of a project team. Managers should take responsibility for maintaining and improving quality control. Employee participation in quality control should be sought and rewarded, including the introduction of new ideas.