The cost of road construction consists of design expenses, material extraction, construction equipment, maintenance and rehabilitation strategies, and operations over the entire service life. An economic analysis process known as Life-Cycle Cost Analysis (LCCA) is used to evaluate the cost-efficiency of alternatives based on the Net Present Value (NPV) concept. It is essential to evaluate the above-mentioned cost aspects in order to obtain optimum pavement life-cycle costs. However, pavement managers are often unable to consider each important element that may be required for performing future maintenance tasks. Over the last few decades, several approaches have been developed by agencies and institutions for pavement Life-Cycle Cost Analysis (LCCA). While the transportation community has increasingly been utilising LCCA as an essential practice, several organisations have even designed computer programs for their LCCA approaches in order to assist with the analysis. Current LCCA methods are analysed and LCCA software is introduced in this article. Subsequently, a list of economic indicators is provided along with their substantial components. Collecting previous literature will help highlight and study the weakest aspects so as to mitigate the shortcomings of existing LCCA methods and processes. LCCA research will become more robust if improvements are made, facilitating private industries and government agencies to accomplish their economic aims.


Chapter One


1.0 Introduction

Nowadays, highway pavement construction, maintenance and rehabilitation costs are rising dramatically. It is essential for highway agencies to utilise tools and approaches that facilitate proper decision-making by applying economics and operations research such as Life-Cycle Cost Analysis (LCCA) to achieve economically reasonable long-term investments. LCCA is a method based on principles of economic analysis. It improves the estimation of the total long-term economic viability of different investment options [1]. This method finds significant application in pavement design and management [2]. A number of agencies employ the LCCA approach to estimate the economic feasibility of pavement designs over the long haul. Thus, it is very important for agencies to realistically evaluate pavement economics in order to provide suitable input to the LCCA.

As a concept, it was in the 1950s that benefit-cost analysis (BCA) was initially applied as a selection factor for various pavement design options. Then in the 1970s, LCCA principles started being implemented in some key projects at the local and national state levels for pavement design and pavement type selection [3].

Considering the mostly inadequate funding under normal circumstances, road authorities are consistently challenged with funding projects due to resource insufficiency [5]. Moreover, with the increasing demand for new road infrastructure, the demand for efficient management of old and new roads is on the rise as well, along with safety demands, accessibility and the implementation of advanced traffic management systems for decreasing socio-economic costs by mitigating maintenance-related environmental effects, traffic issues, and losses.

Maintenance backlogs nonetheless increase too [6] . Road authorities thus emphasise more on better efficiency and lower expenses due to limited funds. Since maintenance expenditures normally comprise half the annual road infrastructure funds, it is very important to prioritise efficiency in road maintenance [5,7]. Thus, with respect to road objects, life-cycle costs (LCCs) are regarded as having higher priority than simply investments. Hence, road authorities are expected to realise the importance of LCCA and maintain a calculation system [8] . LCCs are also deemed to be a restraint in road design selection or the assessment of tenders [9,10] . When calculating LCCs, both road authority costs and costs of socio-economic nature should be taken into account. Road agency (authority) costs comprise expenses for planning, construction, design, maintenance, and rehabilitation. All these costs are usually the government’s responsibility to cover using tax earnings. Socio-economic costs comprise agency costs, user costs (e.g. delay costs, accident costs and vehicle operation costs), and environmental costs [7,11].


1.2 Statement Of The Problem

The dramatic increase in traffic volume in built-up areas, such as the Capital Area, road corridor to the port Djibouti and other Federal Trunk Roads of Nigeria results in more and more construction of new roads and modernization of old ones. Therefore, this requires further studies on how road pavement types are selected.

Road Authorities could make more informed and better investment decisions, because pavement type has a significant impact on future cost and service quality. Traffic growth, especially in heavy axle traffic, can cause damage to pavements much quicker than expected, in turn causing more maintenance and thereby increasing agencies and users costs.

Pavement type choice is usually based on traffic level, soil conditions, atmospheric factors and costs. In many cases, the initial construction cost is the main consideration; the future maintenance and rehabilitation costs may sometimes be forgotten.

Life Cycle Cost Analysis (LCCA) is a process that compares the long-term economic worth of competing alternatives and the results could be useful as a decision-supporting tool.

According to the American Association of State Highway and Transportation Officials (AASHTO) Guide for the Design of Pavement Structures, life cycle costs “refer to all costs which are involved in the provision of a pavement during its complete life cycle”. That means that all pavement options are evaluated by taking into account different agencies and users costs.

Agencies costs include initial construction costs as well as future costs of rehabilitation, maintenance and facility operation. User costs are a result of many different issues, for instance increased delay costs, increased vehicle operating costs or charges in accident costs due to future maintenance actions [4].

All types of asphalt binding materials used in our country are imported with hard currency and its cost is becoming increasingly high from time to time. On the other hand cement materials have high potential of production in Nigeria and it is hoped that the price will decrease. Asphalt pavement requires heavy maintenance activities starting from early stages of its service life, but

Cement Concrete as an Alternative Pavement Material Over Asphalt Concrete in Arterial Roads of Nigeria; Life Cycle Cost Comparison and Economic Analysis rigid pavements do have long design life time and not required as such maintenances in its early service life. Hence, this study will try to address the problem and show economic advantages of using locally available resource for sustainable pavement construction.


1.3 Objectives Of The Research

1.3.1 General objective

The general objective of the study is to identify the sustainable and economical pavement material in arterial roads of Nigeria by making life cycle cost comparisons and economic analysis of Cement Concrete with Asphalt Concrete pavement materials in selected representative arterial roads of the country.

1.3.2 Specific objective;
  1. To identify the initial cost for both concrete and bituminous pavements.
  2. To identify the required types of life time maintenances for both concrete and bituminous pavements.
  3. To identify the various costs related to various maintenances involved in concrete and bituminous pavements.
  4. To carry out economic evaluation of concrete and bituminous pavements on selected segments of roads in Nigeria for forty years and to determine which pavement type is more economical and sustainable.
  5. To draw conclusions and forward recommendations based on the findings of the study.

1.4 Scope And Limitations

The primary objectives of road construction project planning are to optimize quality, cost and time. In Nigeria, this construction industry and its management is at an infant stage, fulfilling these requirements is difficult and challenging. This research work therefore, focuses on one of the basic requirements i.e. cost. Hence, the scope of the study is restricted to the identification of Cement Concrete as an Alternative Pavement Material Over Asphalt Concrete in Arterial Roads of Nigeria ; Life Cycle Cost Comparison and Economic Analysis more economical pavement material over life cycle cost comparison and economic analysis using primary and secondary data.

The scope of the study is, therefore, limited to evaluation of two alternative pavement types based on life cycle cost and economic advantages for sustainable road construction projects. Environmental impact and societal benefits from this sustainable road construction projects will not be fully quantifiable in this study. Because of technological differences, calibration problems and data availability limitations in our country, the researcher couldn’t use models like HDM-4 for the evaluation of user costs and environmental impacts.


1.5 Outline Of The Research

Thesis Organization

The thesis is organized into five chapters as follows:

  • Chapter 1−this chapter begins with the discussion on background and general introduction to the research, statement of the problem, objectives, scope, methodology adopted to achieve the objectives of the study and organization of the thesis.
  • Chapter 2 is literature review from professional journals, research papers, manuals, books, internet searches and informal interview with road design, construction, and contract administration experts. This chapter essentially provides a review of the current state of the art in road construction project pavement type selection trends. Brief definition aspects of different pavement materials, their properties, design criteria, etc. is discussed within this chapter.
  • Chapter 3 is the research methodology followed in order to achieve the objectives of the study.
  • The results of the data obtained from the desk study on selected road construction projects and literature review is presented and discussed accordingly in Chapter 4.
  • Finally, in Chapter 5, conclusions and recommendations are forwarded based on the major findings of the study and discussed how the research objectives align with the findings.

1.6 Research Methods Materials And Procedures

The research work is started with problem identification, which is followed by literature review, formal and informal discussion with professionals in the federal road construction sectors.

The research has then proceeded through economic analysis and life cycle cost comparison of Cement Concrete Pavement material against Asphalt Concrete material in trunk type roads of Ethiopia. Literatures include magazines, books, journals, internet etc. In parallel with literature review, an in-depth desk study has been conducted to identify construction costs, maintenance costs, environmental impacts and road user benefits of each pavement material type. During the desk study, various documents such as design manuals of different countries, technical specifications, feasibility studies reports, Engineering design reports, correspondences, progress reports, completion reports, payment certificates, statements on final account, road asset management documents etc. has been critically evaluated. Whenever there is unclear primary data or ambiguity during the desk study, further explanation or information has been obtained through informal interviews with professionals involving in road construction projects especially pavement or material Engineers, in order to maximize the clarity and to gain adequate understanding of the data for its use in analysis.

The document search was intended to collect pavement design trends, values of initial/construction costs consumed and annual maintenance or rehabilitation costs allocated from some randomly selected upgrading and rehabilitation trunk type road construction projects which are completed/substantially completed.

Then analysis and discussion has been conducted based on the primary & secondary data obtained. Finally, conclusions have been drawn and recommendations forwarded based on the finding of the study and literature reviews. The study has been conducted on projects with high traffic volumes (50 million ESAL to 80 million ESAL) of Trunk type Federal Roads of Nigeria.

Life Cycle Cost Analysis provides a methodology for computing the cost of a product or service during its lifetime. It is used to compare competing design alternatives over the lives of each alternative, considering all significant costs and benefits, expressed in equivalent monetary units [5]. For infrastructure assets such as roads, a large proportion of the total cost over the lifetime of these assets is incurred after construction, i.e. during their service lives. It is possible to avoid most of the “unknown” costs by introducing long-term costs into the pavement valuation processes instead of comparing only initial material and construction costs [5].

Analysis period of 40 years has been determined based on the recommendation of AASHTO 1993 and in order to utilize the full design life of concrete pavement for proper comparison of the two pavement type alternatives.


1.7 Significance Of The Study

In the area of road construction, proper planning of projects is vitally important to highway organizations (authorities) as their construction program outlines how highway funds are to be spent over time and to be sustainable in its serviceability for the comfort of road users, any deviation from the established program often brings a quick response from the public, the press, and politicians. When this occurs, the highway organization loses creditability. On the other hand, if a highway organization can produce realistic program estimates that it is able to attain, then the image of the agency is enhanced.

Therefore, it is the responsibility of the Authorities to make an accurate project planning in the selection of economical pavement materials for the construction of sustainable roads for allocation of justifiable budgets. Thus beneficiaries of this research are;

  1. The implementing authorities (ERA and AACRA), consulting and construction firms plus practicing Engineers,
  2. Educational institutions, which use the information for academic purposes,
  3. Investors to focus on manufacturing of ready mix concrete for pavement works,
  4. Other researchers who will work in relation to pavement LCCA, etc

Investigation On The Economic And Life Cycle Cost Benefits Of Concrete Over Asphalt Pavement


Project Material Download

3,000 Naira


The complete material will be sent to you in just 2 steps.

Quick & Simple…


Step One Purchase

Make payment of ₦3,000: through USSD Transfer, Bank Mobile App, ATM Transfer, or POS Transfer to:

Access Bank PlcAccount No.: 0811003731
Name: Samphina Academy
Account Type: Current

Or Click Here to pay with Debit Card

FOR CLIENTS OUTSIDE NIGERIA:
Click Here to pay with Debit Card ($15)
GHANA – Make Payment of 60 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

  PAY WITH CRYPTOCURRENCY


Step Two Purchase

Send the following details through Text Message or WhatsApp Messenger | +234-8143831497

  • Payment Details 
  • Email Address 
  • Investigation On The Economic And Life Cycle Cost Benefits Of Concrete Over Asphalt Pavement

The complete material will be sent to your email address after receiving your payment information | T & C Apply


  Contact Our Help Desk


You may also like:

⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


Investigation On The Economic And Life Cycle Cost Benefits Of Concrete Over Asphalt Pavement


Disclaimer

This research material “Investigation On The Economic And Life Cycle Cost Benefits Of Concrete Over Asphalt Pavement” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “Investigation On The Economic And Life Cycle Cost Benefits Of Concrete Over Asphalt Pavement” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.


How to defend your research work


This is a general guide on how to defend your research work:

1. Prepare For Questions:

If you are preparing for questions that may be asked during your defense, then your answers will flow smoothly and effectively. This will prove your knowledge on the subject e.g “Investigation On The Economic And Life Cycle Cost Benefits Of Concrete Over Asphalt Pavement“, and strengthening your argument. Ask friends and family, read your work for them to listen to your presentation, and write down questions. You may be lucky the panel will ask you those you have already prepared on.

2. Strong Summary:

Summarizing your chapters will help keep your audience focused because it is easy for a mind to drift, so providing summaries will ensure your panel will follow along, even if they lose focus for a brief moment. Visual aides, such as graphs and power-point presentations can be very helpful. If you are going to use these, make sure you will practice your presentation with them.

3. Be Confident in Your Research Work:

Not knowing your topic “Investigation On The Economic And Life Cycle Cost Benefits Of Concrete Over Asphalt Pavement” inside out will cause you to struggle and ultimately fail with your defense. You need to know the subject from every angle to ensure you are fully prepared for any question that may come your way.

4. Conclusion:

Reinforce your findings to conclude your defense. The finale of your presentation should focus on proving the work that has been done. You may need to recap on what has changed and remained unchanged, if is necessary.

5 . Listen:

Before you get defensive or recite a particular answer, make sure you truly understand the question being asked. Being a good listener is an important quality, because providing an inaccurate or off-topic answer will also weaken the validity of your paper.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.