Abstract


In this study, the method of nodal analysis was employed to design the optimum well completion needed by a particular oil well (designated as C-05) located off the coast of the Niger Delta. Based on available data from the geometry and configuration of the well, as well as well test data, an analytical software, PROSPER, used for well design, modelling and performance calculations, was first used to calibrate the well i.e. model its behaviour. The well has an issue of increasing water cut which has a huge impact on oil production negatively. Using the calibrated model, sensitivity runs were carried out on suspected node that could help cub the problem, i.e. provide higher water cut that would still keep production rate within its economic limit and extend the well’s life. The software approach was based on the principles of Nodal analysis. This work shows the use of nodal analysis in predicting well performance and optimising a system.


Chapter One


1.0 Introduction

Hydrocarbons(oil and gas) are found in the pore spaces of sedimentary geologic formations (reservoir rocks). Once an oil or gas reservoir is discovered and assessed, production engineers begin the task of maximizing the amount of oil or gas that can ultimately be recovered from it. Some reservoir rocks may allow the oil and gas to move freely, making it easier to recover. Other reservoirs do not part with the oil and gas easily and require special technique to move the oil or gas from the pore spaces in the reservoir rock to a producing well. Even with today’s technology, in some reservoirs more than two-thirds of the oil in the reservoir may not be recoverable.

Optimum production of oil from an oil reservoir is the main objective or target of the operators of an oil well in order to meet up with the growing demands of the crude oil. The efficient production of fluids from a reservoir depends on the maintenance of the pressure draw down between the reservoir and the well bore which is the driving force or energy that forces the reservoir fluid (oil) from the reservoir into the wellbore.

The productivity of the system is dependent on the pressure loss which occurs in
several areas of the flow system namely:-

  • The reservoir
  • The wellbore
  • The tubing string
  • The choke
  • The flow line
  • The separator

The production system.

Fig 1: The production system.

Under natural flowing conditions the reservoir pressure

must provide all the energy to operate the system i.e. all the pressure drop in the system.

PR= ∆PSYSTEM + PSEP

where;

PR = reservoir pressure

∆PSYSTEM = total system pressure drop

PSEP = separator pressure

To maintain an optimum production rate from the well, the reservoir energy which is the pressure draw down between the wellbore and the reservoir must be maintained or sustained. The sustenance or maintenance of this energy (pressure draw down) depends on the reservoir drive mechanism.

Artificial Lift

Artificial lift is any process used to raise oil to the surface through a well after reservoir pressure has declined to the point at which the well no longer produces by means of natural energy.

At some time in the life of a well, the reservoir will no longer be able to flow naturally to the surface at the required rate. This may be due to:-

  • Insufficient pressure draw down between the reservoir and the well.
  • Dead wells which are as a result of pump kill fluid into them.
  • Increasing water-cut or production.

The above conditions have something in common; the hydrostatic gradient is higher than the pressure gradient. The reservoir’s natural energy must then be supplemented by some form of artificial lift.

IPRVLP curve for a naturally flowing well and IPRVLP curves for a dead well.

Fig 1.2 (a) IPR/VLP curve for a naturally flowing well, (b) IPR/VLP curves for a dead well.

Types Of Artificial Lift

There are four basic ways of producing an oil well by artificial lift. These are:

  1. Gas Lift
  2. Sucker Rod Pumping
  3. Submersible Electric Pumping
  4. Subsurface Hydraulic Pumping
Gas Lift

Gas lift is one of the artificial lift method used in the industry to supplement the reservoir energy for continued production of oil. Gas lift is either a continuous or intermittent process whereby gas is injected into the well to reduce the density of the produced fluid. This has the effect of reducing the static head in the tubing thereby assisting the flow of fluid from the reservoir through the tubing to the well head.. The technology (gas lift) has been used to produce oil and gas from wells with low reservoir pressure by reducing the hydrostatic pressure in the tubing. Gas is injected into the tubing as deep as possible and mixes with the fluid from the reservoir. Gas lifting is considered to be one of the most flexible and cost-effective artificial lift systems. The optimum level of production rates versus lifting depth achieved for this system is unmatched (Eikrem et al, 2002).

This system is best used for highly deviated wells producing sand, for wells with high formation of gas and liquid ratios, and for wells with multiple completions (Brown et al, 1980). Thus, optimizing production levels for these wells is one of the most important concerns of oil and gas companies. As oil wells mature, engineers face bigger challenges in recovering oil. One of the most common techniques used for improving crude oil production is through gas lifting. Because of its low operating cost and flexibility of production that it provides, many companies are involved with this system as it accounts for some reasonable proportion of oil production as evident from table 1. However, several factors limit the effectiveness of gas lifting, as different reservoirs are faced with variable pressure levels, temperature, and depositions. Therefore, as operations take place, the need for continuous system design, diagnosis, and troubleshooting arises in order to optimize production levels.

Gas Lift

Gas Lift Types

There are two basic types of gas lift systems used in the oil industry.

These are;

  • Continuous flow gas lift
  • Intermittent flow gas lift
Continuous Flow Gas Lift

In the continuous flow gas lift process, relatively high pressure gas is injected downhole into the fluid column. This injected gas joins the formation gas to lift the fluid to the surface by one or more of the following processes:

  1. Reduction of the fluid density and the column weight so that the pressure differential between reservoir and wellbore will be increased
  2. Expansion of the injection gas so that it pushes liquid ahead of it which further reduces the column weight thereby increasing the differential between the reservoir and the wellbore.
  3. Displacement of liquid slugs by large bubbles of gas acting as pistons.

If the lower flowing pressure gradient reduces the flowing bottomhole pressure (BHFP) to establish the drawdown required for attaining a design production rate from the well. If sufficient drawdown in the bottomhole pressure (BHP) is not possible by continuous flow, intermittent gas lift operation may be used.

continuous gas lift installation.

Fig 1-3 continuous gas lift installation.

Intermittent Flow Gas Lift

This operates on the principle of intermittent gas injection. Gas lift injection occurs for a certain length of time and then stops. After a period of time has elapsed, injection again takes place and the cycle is repeated. In the intermittent flow system, fluid is allowed to accumulate and build up in the tubing at the bottom of the well.

The frequency of gas injection in intermittent lift is determined by the amount of time required for a liquid slug to enter the tubing. The length of the gas injection period depends on the time required to push a slug of liquid to the surface.

Gas lift is essentially an extension of natural flow, whereby the producing GOR (gas oil ratio) is artificially increased by the injection of gas. The requirement of gas lift is often a result of either an increased water cut or a declining reservoir pressure.

For maximum benefit, the gas should be injected as deep as possible, reducing the density of the fluid column as much as possible. Gas is injected through gas lift valves, a series of which are run inside pocket mandrels together with the tubing string, and so designed that only one valve is open and passing gas at any one time.

Intermittent gas lift installation.

Fig 1-4  Intermittent gas lift installation.


1.1 Background of study.

Before a well can produce oil or gas, a borehole is drilled from the surface to the oil and gas pool or reservoir rock. The borehole must be stabilized with casings cemented in place. A small diameter tubing string is centered in the wellbore and is sometimes held in place with packers. This tubing will carry the oil and gas from the reservoir to the surface. Reservoirs are typically at elevated pressure because of the underground forces that surrounds them. The driving force which causes these fluids to move out of the reservoir comes from the compression of the fluids that are stored in the reservoir. The actual energy that causes a well to produce oil results from a reduction in pressure between the reservoir and the producing facilities on the surface.  Early in its production life, the underground pressure will often push the hydrocarbons all the way to the surface facilities. Depending on reservoir conditions, this “natural flow” may continue for many years. The production capacity of an oil well is a  key surveillance factor in monitoring the well’s performance  which is dependent on a number of other factors which include; fluid properties and composition of the oil itself, gas oil ratio, water cut, reservoir characteristics and completion strategy/design (Beggs et al, 1991).  The well performance consists of the inflow performance relationship (IPR) which involves flow from the reservoir into the wellbore and the outflow performance which involves flow from the wellbore up the tubing to the surface production facilities. Constant monitoring of the well performance is of paramount importance in the oil and gas industry as it is critical to the crude oil production obtainable from such wells and the equivalent profit margins that will be generated from the production (Hernandez et al, 2001). Monitoring of the well’s performance also help the engineer to determine the economic limit and amount of oil production recoverable from such wells. Once a well is produced down to its economic limit due to pressure depletion, increase in water-cut the pressure differential which is the driving energy becomes insufficient in producing the fluid (oil) to the production facilities

(Beggs et al, 1991).  Gas lift method once applied at the required injection gas rate can supplement the reservoir energy to drive the oil to the surface.

The introduction of lift gas to a non-producing or low producing well is a common method of artificial lift. Naturalgas is injected at high pressure from the casing into the wellbore and mixes with the produced fluids from the reservoir . The continuous aeration process lowers the effective density and therefore the hydrostatic pressure of the fluid column, leading to a lower flowing bottom-hole pressure (Pbh). The increased pressure differential induced  across the sand face from the in situ reservoir pressure (Pr), given by (PrPbh), assists in flowing the produced fluid to the surface. The method is easy to install, economically viable, robust, and effective over a large range of conditions, but does assume a steady supply of lift gas. At a certain point, however, the benefit of increased production due to decreased static head pressure is overcome by the increase in frictional pressure loss from the large gas quantity present. This has the effect of increasing the bottom-hole pressure andlowering fluid production.


1.2 Statement of problem

Movement or transport of oil to the production facilities requires energy to overcome friction losses in the systems and to lift the products to the surface. The production system can be relatively simple or can include many components in which energy or pressure losses occur.

The production rate or deliverability of a well can often be severely restricted by the performance of only one component in the system due to pressure losses. As mentioned earlier, within the life of a reservoir, there is a time when the available reservoir pressure is unable to lift the produced fluid to the surface. This is mainly as a result of pressure depletion , increased water production (water cut). Also, the need may arise for producing companies of oil and gas to maximize the production of oil and gas at the current installation facilities and reservoir condition. Most times, the efforts of the companies are directed to a medium and long term project to maximize the factor of recovery (production of oil to the minor possible cost), and in the short term to accelerate the recovery of the recoverable reservations. These efforts are usually realized during the economic limit period of the well in which the energy for production (pressure draw down) is insufficient for the required production rate. It becomes necessary to optimize the production system of the well to increase the economic recovery and to meet up with the increasing global energy demands.


1.3 Objectives of study

As discussed earlier, the producing capacities of oil wells reduces as the oil field matures (function of time) due to the combined effects of interrelated factors that affects the well’s performance and economic recovery. To address this issue, optimization of the well (production system ) becomes necessary to maximize the well’s production.

One of the most used techniques for optimizing the oil production systems, considering its verified effectiveness and worldwide level trust worthiness is the Nodal analysis (Beggs et al, 1991). In order to optimize the production system using this technique, it is necessary describing the production system, making emphasis on the components of the production system in order to determine the production capacity of the well. The Nodal analysis allows to evaluate the performance of a completions of production, calculating the relation of the flow of production and the pressure drop that will occur in all its components, allowing to determine the flow of oil or gas that can produce a well bearing in mind the geometry of the perforation and increasing the rate of production to a low cost. Though gas lift optimization will always improve the production capacity, there is a need to identify the gas injection rate and tubing size that will lead to a maximum production from the well.

The project will aim to identify the factors and parameters that affect the well’s performance.

The project will aim to apply the Nodal analysis technique in simulating flow and analyzing the production system of a naturally flowing well and identifying the pressure losses in the producing system.

The project will also aim to design a gas lift system (model) for the naturally flowing well and optimizing the production system to improve the production system via the gas lift system model.

In addition to these, this work will aim to compare the results in terms of production capacity (production rate) for a naturally flowing well and the optimized results of the gas lifted well.


1.4 Scope of study

The study involves the collection of well, reservoir, completion and well test data (and other relevant data) to build a well model in order to characterize the well.

The following points highlight the scope of this study:

  • Designing of a well model that will serve the purpose of this study using relevant input data.
  • Appropriate selection of the best correlations available in the Prosper nodal analysis software that will aid in a more accurate performance prediction and matching of the well data.
  • Generating the inflow performance relationship (IPR) of the well model to characterize the well’s performance.
  • Generating the vertical lift performance (VLP) of the well’s model to characterize the outflow performance of the well.
  • Matching the IPR and VLP curve to determine the optimum flow condition of the well at the current reservoir pressure.
  • Validating the well model with the help of available well test data.
  • Using the validated well model to run a sensitivity analysis and prediction to investigate the effects of different parameters on the well performance.
  • Designing a gas lift system for the well model.
  • Perform a sensitivity analysis and prediction study as part of the optimization process.
  • Comparing the optimized results derived from the gas lifted well model and the natural flowing well.

This will help meet the objectives of this study and also examine the results of optimizing production from the well. The predictions of different parameters that are critical to the performance of the reservoir system will also be analyzed.


1.5 Limitations of study

During the course of this study, some limitations were highlighted and assumptions made. This was done so as to achieve the goal of this project by idealizing the study/model.

These limitations include:

  • Multiphase fluid flow problems along the tubing.
  • Ability of the well to deliver a stable flow rate which can impose additional restrictions on the achievable flow rate.
  • Well instability.

Chapter Five


Conclusion

Well X-05 has been successfully calibrated and optimised using PROSPER system analysis software tool. The well’s successful calibration shows the effectiveness of the calibration matching procedure aimed at designing a well model to exactly reproduce the observed well performance with less than 0.02% variation in pressure drop calculation and about 0.5% in flow rate calculation. With the aid of PROSPER we were able to utilize the technique of Nodal analysis to analyse majority of the components in the production system and their effects on the production performance of the well under study. This shows the efficiency of using Nodal Analysis technique in modelling well performance if the configuration and location of all system components is accurately described. If accurate matching/calibration of the well model to fit the real life case scenario of the well is achieved, then with full confidence the sensitivity studies can be performed for the well.

In the course of the project, the following was achieved using the nodal analysis technique:

  • The PVT, VLP and VLP were successfully matched.
  • In the sensitivity analysis study, utilizing the concept of Nodal analysis made it possible to determine the effect of critical factors (well head pressure (WHP), reservoir pressure, water cut and tubing size) on the wells performance in terms of productivity.
  • The condition at which the well will seize to produce in terms of water cut was determined. In chapter 4 of the project work, the results obtained can be found in the tables. In terms of reservoir pressure, the reservoir and the well will not provide enough pressure drawdown to produce the oil when the reservoir pressure falls down to 2500 psig ( table 4.5.2). at this condition, the well will not flow naturally, therefore the need for the application of artificial lift technology is required to revive the well back to production.
  • From table 4.5.2 (chapter 4), it is observed that an increase in Water Cut impedes production rate. Therefore, the maximum economic water cut is 45% delivering a liquid production rate of 4698.9 stb/d at the current reservoir pressure. This is because the flow rate at the 45% water cut is above the economic limit. At a water-cut value above the economic limit (45%), the well seizes to flow.
  • The effect of altering the well head pressure on production rate was achieved (table 4.5.2.1)
  • The optimum tubing size that will give the highest or optimum production rate was also determined at the current well and reservoir condition using the nodal analysis technique. The optimum tubing size determined is the 5.100 inches tubing size (table 4.5.2.3) delivering an optimum flow rate of 4755.2 stb/d. Installing a tubing size greater than 5.100 inches results in a “no flow condition” (killing the well).

Nodal analysis proved useful in optimizing the system and predicting well performance with changing reservoir properties. The software approach in using nodal analysis is an unparalled way of accurately predicting well performance so that the response to production system design may be perfectly predicted before implementation.


5.1 Recommendation

Comprehensive pressure survey test should be conducted to find out up-to-date values of reservoir parameters.
The current study did not undertake coning studies, decline curve analysis and a gas lift case scenario due to insufficient data.. Should the reservoir fluid contacts be known, it will be required to perform calculations to determine the critical production rate for the well as well as the possible breakthrough time at current production rate and the optimum length and depth of perforation. Production history will enable performing decline curve analysis to determine the well fluid’s production rate decline model and the exact time at which the artificial lift operation should be commenced.

Optimization studies are better done for entire fields rather than just single wells. Should oilfield data be available, an entire filed development program for the oilfield in order to yield optimum recovery at the minimum possible cost could be drafted out. This will involve the use of reservoir simulation software to describe fluid dynamics with depletion, optimum well placement, dynamic fluid contact level monitoring as well gas lifting of the entire field (since gas lifting is not economically suitable for single wells).


Gas Lift Optimization Of Oil Producing Wells Using Prosper Nodal Analysis


Project Material Download

3,000 Naira


The complete material will be sent to you in just 2 steps.

Quick & Simple…


Step One Purchase

Make payment of ₦3,000: through USSD Transfer, Bank Mobile App, ATM Transfer, or POS Transfer to:

Access Bank PlcAccount No.: 0811003731
Name: Samphina Academy
Account Type: Current

Or Click Here to pay with Debit Card

FOR CLIENTS OUTSIDE NIGERIA:
Click Here to pay with Debit Card ($15)
GHANA – Make Payment of 60 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

  PAY WITH CRYPTOCURRENCY


Step Two Purchase

Send the following details through Text Message or WhatsApp Messenger | +234-8143831497

  • Payment Details 
  • Email Address 
  • Gas Lift Optimization Of Oil Producing Wells Using Prosper Nodal Analysis

The complete material will be sent to your email address after receiving your payment information | T & C Apply


  Contact Our Help Desk


You may also like:

⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


Gas Lift Optimization Of Oil Producing Wells Using Prosper Nodal Analysis


Disclaimer

This research material “Gas Lift Optimization Of Oil Producing Wells Using Prosper Nodal Analysis” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “Gas Lift Optimization Of Oil Producing Wells Using Prosper Nodal Analysis” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.


How to defend your research work


This is a general guide on how to defend your research work:

1. Prepare For Questions:

If you are preparing for questions that may be asked during your defense, then your answers will flow smoothly and effectively. This will prove your knowledge on the subject e.g “Gas Lift Optimization Of Oil Producing Wells Using Prosper Nodal Analysis“, and strengthening your argument. Ask friends and family, read your work for them to listen to your presentation, and write down questions. You may be lucky the panel will ask you those you have already prepared on.

2. Strong Summary:

Summarizing your chapters will help keep your audience focused because it is easy for a mind to drift, so providing summaries will ensure your panel will follow along, even if they lose focus for a brief moment. Visual aides, such as graphs and power-point presentations can be very helpful. If you are going to use these, make sure you will practice your presentation with them.

3. Be Confident in Your Research Work:

Not knowing your topic “Gas Lift Optimization Of Oil Producing Wells Using Prosper Nodal Analysis” inside out will cause you to struggle and ultimately fail with your defense. You need to know the subject from every angle to ensure you are fully prepared for any question that may come your way.

4. Conclusion:

Reinforce your findings to conclude your defense. The finale of your presentation should focus on proving the work that has been done. You may need to recap on what has changed and remained unchanged, if is necessary.

5 . Listen:

Before you get defensive or recite a particular answer, make sure you truly understand the question being asked. Being a good listener is an important quality, because providing an inaccurate or off-topic answer will also weaken the validity of your paper.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.