Employer (Client) Contribution To Delay In Building Construction Project

Project and Seminar Material for Quantity Surveying QS

Employer (Client) Contribution To Delay In Building Construction Project


Chapter One


Introduction

1.0 Background to the Study

A major criticism facing the Nigerian construction industry is the growing rate of delays in project delivery. Delay is a situation where the contractor and the project owner jointly or severally contribute to the non completion of the project within the original or stipulated or agreed contract period (Aibinu and Jagboro, 2002). Untimely completion of building projects has been found to be a major setback in the construction industry. This in most cases is normally due to delays that may have occurred during the execution stage of the project, (Odusami and Olusanya 2000).

Delay is the most common and costly problem encountered on public projects (Alkass et al 1995). states that delays on a construction site are normally inevitable and as a result many claims arise with few of them ending up in litigation. Thus the industry needs to develop methodologies and techniques to prevent and more efficiently resolve delay claims. According to Mohammed (2008) delay can be broadly considered in three headings

  1. Delay caused by the contractor.
  2. Delay caused by the employer.
  3. Delay due to causes outside the both; concurrent delay and acts of God.

Merzher et-al (2000). Conducted a survey of the causes of delay in construction industry in Lebanon from the view point of owners/client, contractors and Architectural/Engineering firms, it was found out that owners had more concerns with regard to financial issues to be the most important, while consultants considered project management issues to be the most important causes of delay.

Giwa (1987) in (shirinkpo 1999) stated that projects suffer delay because of the clients over projection of revenue expectation during periods of project planning feasibility studies, cost planning etc, Mohammed (2008). Delay in construction projects may result from many circumstances and factors construction projects are works that have been set to be carried out at a designed schedule or period. But delay occurs in almost every construction project and the magnitude of these delays varies considerably from one project to another. Some projects are delayed over a year and some a few days behind schedule. Thereby it is essential to minimize and avoid delay in any construction projects.


1.1 Statement of Research Problem

In construction projects the owner of the project (employer/client) always expects to achieve their desired intentions at the agreed time, cost, and to his satisfaction, in project delivery, but delay has been identified as a major problem that hampers on the growth and development of the construction industry in Nigeria giwa (1987). in Izam and bustani (2001).


1.2 Aim and Objectives

The aim of this project is to identify the degree of significance of the factors pertinent to employer’s contribution to delay on building projects from the perception of professionals.

  1. To identify the factors that contributes to delay by the employer.
  2. To identify the effects of the factors that contributes to delay by the employer.

1.3 Need for the Study

The findings in this research will be useful to clients and other stakeholders that take part in construction industry as it will help to point out factors that cause delay by the client on construction projects. The study will also help the clients on how to plan well, and avoid any means of causing delay by them on the execution of the project.


1.4 Scope and Limitation

In this study delay shall be considered based on client related delay, According to Odusami and Olusanya (2000). This research focuses on both government and private owned projects. This research work deals with both the pre and post contract activities as related to delays. It is however limited to the study of delay caused by only one party to the contract (the employer). It does not look at those caused by the contractor, consultants or any third party. The research centers on only building construction projects on both public and private projects located within Zaria and Kaduna metropolis.


Employer (Client) Contribution To Delay In Building Construction Project


Project Material Download

3,000 Naira


The complete material will be sent to you in just 2 steps.

Quick & Simple…


Step One Purchase

Make payment of ₦3,000: through USSD Transfer, Bank Mobile App, ATM Transfer, or POS Transfer to:

Access Bank PlcAccount No.: 0811003731
Name: Samphina Academy
Account Type: Current

Or Click Here to pay with Debit Card

FOR CLIENTS OUTSIDE NIGERIA:
Click Here to pay with Debit Card ($15)
GHANA – Make Payment of 60 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

  PAY WITH CRYPTOCURRENCY


Step Two Purchase

Send the following details through Text Message or WhatsApp Messenger | +234-8143831497

  • Payment Details 
  • Email Address 
  • Employer (Client) Contribution To Delay In Building Construction Project

The complete material will be sent to your email address after receiving your payment information | T & C Apply


  Contact Our Help Desk


You may also like:

⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


Disclaimer


This research material “Employer (Client) Contribution To Delay In Building Construction Project” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “Employer (Client) Contribution To Delay In Building Construction Project” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.