The Effects Of Construction Delays On Projects Delivery In Nigeria

The Effects Of Construction Delays On Projects Delivery In Nigeria
Abstract
Construction delay has become endemic in Nigeria. It is imperative to create awareness of the extent to which delays can adversely affect project delivery. This paper identifies, by questionnaire evaluates and through empirical method assesses the effects of construction delays. The findings showed that time and cost overruns were frequent effects of delay. Delay had significant effect on completion cost and time of 61 building projects studied. Client-related delay is significant in Nigeria. Acceleration of site activities coupled with improved clients’ project management procedure and inclusion of appropriate contingency allowance in precontract estimate should assuage the adverse effect of construction delays.
Table Of Content
- Cover Page
- Title Page
- Certification
- Dedication
- Acknowledgement
- Abstract
- Table of Content
Chapter One:
Introduction
- 1.1 Background of the Study
- 1.2 Statement of the Problem
- 1.3 Objectives of the Study
- 1.4 Research Questions
- 1.5 Research Hypotheses
- 1.6 Significance of the Study
- 1.7 Scope/ Limitation of the Study
- 1.8 Definition of Terms
Chapter Two:
Review of Related Literature
- 2.1 Introduction
- 2.2 Conceptual Framework
- 2.3 Theoretical Framework
- 2.4 Empirical Review
Chapter Three:
Research Methodology
- 3.1 Introduction
- 3.1 Research Design
- 3.3 Area of the Study
- 3.4 Population of the Study
- 3.5 Sample Size and Sampling Techniques
- 3.6 Instrumentation
- 3.7 Validation of the Instrument
- 3.8 Administration of the Instrument
- 3.9 Method of Data Analysis
Chapter Four:
Presentation, Analysis and Interpretation of Data
- 4.1 Introduction
- 4.2 Presentation and Analysis of Data
- 4.3 Testing of Hypotheses
- 4.4 Discussion of Findings
Chapter Five:
Summary, Conclusion and Recommendations
- 5.1 Introduction
- 5.2 Summary
- 5.3 Conclusion
The Effects Of Construction Delays On Projects Delivery In Nigeria
The complete material will be sent to you in just 2 steps.
Quick & Simple…
Make payment of ₦3,000: through USSD Transfer, Bank Mobile App, ATM Transfer, or POS Transfer to:
![]() | Account No.: 0811003731 |
Name: Samphina Academy | |
Account Type: Current |
Or Click Here to pay with Debit Card
FOR CLIENTS OUTSIDE NIGERIA: |
Click Here to pay with Debit Card ($15) |
GHANA – Make Payment of 60 GHS to MTN MoMo, 0553978005, Douglas Osabutey |
Send the following details through Text Message or WhatsApp Messenger | +234-8143831497
- Payment Details
- Email Address
- The Effects Of Construction Delays On Projects Delivery In Nigeria
The complete material will be sent to your email address after receiving your payment information | T & C Apply
You may also like:
⚠️ Need a different topic? Perform a quick search
Disclaimer
This research material “The Effects Of Construction Delays On Projects Delivery In Nigeria” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.
The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.
samphina.com.ng is only providing this material “The Effects Of Construction Delays On Projects Delivery In Nigeria” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.