Design And Construction Of A Single Phase Automatic Change Over Switch With Phase Selector

Project and Seminar Material For Electrical Electronics Engineering EEE

Design And Construction Of A Single Phase Automatic Change Over Switch With Phase Selector


Abstract


This paper is aimed at designing and constructing a workable automatic change over switch with phase selector circuit which switches on the load from National Electric Power Authority (NEPA) to a generator when power comes back. The system is designed in such a way that it can carry two separate loads at the same time, i.e. it can transfer load either to generator or NEPA supply. The circuit is designed by using electrical/electronics circuit components. The design is done by the use of circuit components such as contactors, circuit breaker, and circuit breakers. It is shown that the designed circuit works and also proves that the system can be designed and built right here in Nigeria.


Chapter One


Introduction

1.1 Introduction

Change over switch is a device used to switch off a power supply and subsequently switch on another power source. Basically it is aimed at switching on a more convenient power supply to the load. Since it switches on power to the load precaution has to be taken while choosing the type of change over switch. Also size, arcing control are put into consideration in the choice.

A good switch should be the one whose contact is made in such a way as to limit the arc formation by having no contact-bounce and by having contacts made of good conductive, corrosion resistance and wear resistance materials.

A good change over switch must have adequate insulation and must be so constructed and located as not to constitute a potential hazard.

A good change over switch should also have tight contacts so as to limit or eliminate the possibility of partial contacts at the contact point. The partial contact lead to over heating of the components and may lead to fire out break.


1.2 Aims and Objectives

Due to inconsistent supply of power, there is a growing need for an alternative source of power supply. This has led to heavy capital investment in a bid to curb power failure and ensure regular power supply for our industries, hospitals and homes. The problem of power failure can be checkmated with the use of standby generating set.

An Engineering author Tony Rudk Inn said in his book titled “Upgraded signal source with improved performance and reliability” that the cost and depreciation associated with breakdown vary from one application to the other, and in some cases, the user has little choice but to ensure that a stand-by unit is available to take over on event of failure of primary system.

If some of these big firms do not make provisions for stand-by power source, frustration could set in which may lead to the closure of business and thus throwing workers into unemployment. Also in the case of hospitals undergoing a surgical operation and the power supply suddenly goes off, the patient might loose his life due to power outage.

Furthermore, if the President of the country is making a nation wide broadcast and all of a sudden there is power failure in the transmitting station, it would be viewed as an attempt to sabotage the government ruling and some people must go for it.

Sequel to the rate at which more sophisticated electrical/electronics gadgets are being procured an installed in our homes, hospital and business premises, there is a justifiable need for a faster and more reliable change over system in an event of power outage.

In view of these considerations, this project is aimed at designing and constructing a workable automatic change-over switch with phase selector circuit which switches on the load from National Electric Power Authority (NEPA) to a generator when power comes back. Also when there is a phase failure in any of the NEPA phase carrying the load, the change-over switch will be changed to alternative phase.


1.3 Scope and Limitation of the Study

The automatic change over switch is aimed to achieve the following automatic actions.

  1. To start the generator
  2. To change power to generator
  3. To change back to NEPA
  4. To change the generator
  5. To change to alternative phase in case of phase failure.

The automatic change over unit can be operated in single or three phase-system. The automatic change over switch has the following advantages.

  1. It minimizes damage to lives/equipment since it has its own monitoring system and its switching requires no human contact with the switch, thus eliminating human error.
  2. It reduces its change-over timing to the minimum due to its fast response to power outage.
  3. It maintains high quality of service through its fast and prompt response
  4. It avoids and reduces fuel consumption since the generator is switch off immediately NEPA supply is restored.

Moreover the size and capacity of the Unit will depend upon the load for which it will be used. The Unit is also portable, easy, convenient and safe to install.


Chapter Five


5.0 Observations Summary and Conclusion

5.1 Observations

As earlier mentioned in the previous chapter that due to the prototype nature of our project, we had to provide certain things to really show the workability change over unit fig 4.1 (a) shows a complete circuit diagram of the change over unit.


5.2 Summary

Also due to unavailability of funds, we were not anble to produce an automatic mains failure that can be operated with a kick starting hgenerator. This entails acquiring a contactor with a very high amperage. This actually is very expensive.


5.3 Suggestions

Therefore, funds should be made available for the commercial production of this unit. It will surely find a very high demand in our market as most people will prefer it to the conventional manually opoerated change over switch.


5.4 Conclusion

The Automatic change over unit as democnstrated shows that the designed circuit in fig. 4.1 (a) actually works and also prove that the system can be designed and built right here in Nigeria.


How To Get The Complete Material For Design And Construction Of A Single Phase Automatic Change Over Switch With Phase Selector


Project Material Download

3,000 Naira


The Complete Material will be Sent to You in Just 2 Steps

Quick & Simple…


Step One Purchase

Make a Mobile Transfer or POS Payment of ₦3,000 to any of the Account Below

Access Bank PlcAcc No: 0811003731
Samphina Academy
Current Account
Zenith BankAcc No: 1225513212
Samphina Academy
Current Account

Or CLICK HERE To Pay With Debit Card

FOR CLIENTS OUTSIDE NIGERIA
CLICK HERE To Pay With Debit Card ($15)
GHANA – Make Payment of 80 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

Step Two Purchase

Send the Following Details on WhatsApp ( 08143831497) After Payment

  • Payment Details
  • Email Address 
  • Design And Construction Of A Single Phase Automatic Change Over Switch With Phase Selector

The Complete Material Will Be Sent To Your Email Address After Receiving Your Details
T & C Apply


  Contact Our Help Desk


⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


Disclaimer


This research material “Design And Construction Of A Single Phase Automatic Change Over Switch With Phase Selector” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “Design And Construction Of A Single Phase Automatic Change Over Switch With Phase Selector” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.