Abstract


Power supply and failure is a frequent experience that occurs in our mains. Power failure is a period of time when the electricity supply to a particular building or area is interrupted, for example because of damage to the cables or any other reason, while Power restoration is a period of time when the electricity supply to a particular building or area is restored, because of replacement or servicing damage to the cables or any other reason. For us to be notified when the power OFF and ON condition has occurred a power monitoring device is used. This system indicates when there is power failure and resumption in our mains through alarm indication. As soon as the system experiences power failure or resumption you will receive a signal from an alarm.


Chapter One


1.1 Introduction

In modern society, it is impossible to imagine life without electricity. Modern equipment requires a continuous supply of electricity. Not only industry, but also in the household. Take the case of an ordinary refrigerator. If you experience a power off situation, your food will be spoilt. But much more important, what if the power failure “spoils” your business. For example, uninterrupted power supply is needed for your server, which manages your accounting programme or provides uninterrupted operation of your website.

Of course, in most critical applications, uninterruptible power supplies (UPS) are used, but this is not always the case. Also, these devices cannot provide continuous operation in the event of remote power off. Often you need to take other action according to the situation. But how do you know that the remote site has experienced a power off condition?

For us to be notified when the power OFF and ON condition has occurred a power monitoring device is used. This system indicates when there is power failure and resumption in our mains through alarm indication. As soon as the system experiences power failure or resumption you will receive a signal from an alarm.


1.2 Objective of the Project

The objective of the project is to design a power supply and failure monitoring device that will trigger a buzzer when the mains supply fails or restored. Once the buzzer sound, one will know that there is a loss of power supply and actions need to be taken to rectify the situation by providing alternative power supply or relocating the installation while when the second alarm with different sound blows it also indicate that the mains have been restored.


1.3 Purpose of the Project

The purpose of this work is to build a power monitoring device with multiple functions that monitors when there is power supply and power failure.

This device is designed to inform you when the power has failed so that the user can turn ON their alternative power supply such as standby generator, solar inverter, or any other alternative power supply while power resumption alarm tells the user when the mains was restored in order for him/her to switch off their alternative power supply.
This device notifies you by alarm when your electrical equipment suffers a power supply. If you have important equipment you want to run with mains and want to know if there has been a power supply so that you power the device, this app can help you by telling you when electric power is supplied.


1.4 Significance of the Project

A failure in the power supply to some people causes only a irritant, they may have to reset a clock, but to other people especially business, they can and do cause thousands of pounds of damage. This damage may be in the form of lost food in a fridge or freezer, amounting to hundreds of naira of lost stock, it may be chemicals, medicines, and electronics.

A power cut may have cut the heater off in the greenhouse, a fan off in a computer room, it may have caused a computer to fail, there are hundreds of reasons that you need to know if there is or has been a power failure. This device is designed to inform you when the power has failed so that the user can turn ON their alternative power supply such as standby generator, solar inverter, or any other alternative power supply while power resumption alarm tells the user when the mains was restored in order for him/her to switch off their alternative power supply.
Power restoration alarm notifies you by alarm when your electrical equipment suffers a power supply. If you have important equipment you want to run with mains and want to know if there has been a power supply so that you power the device, this app can help you by telling you when electric power is supplied.


1.5 Consequences of a Power Failure

  1. No lights in the house
  2. Loss of refrigeration – food spoils
  3. No heat or air conditioning
  4. No flushing toilets or running water
  5. Can’t cook on electric range or in microwave oven

1.6 Application of Power Failure Alarm

Typical uses of power failure and resumption signal include monitoring:

  • Fridges/freezers;
  • Fish tanks/aquariums;
  • Sump pumps;
  • Computer equipment;
  • Heating systems;
  • Chemical storage;
  • And many other applications.

1.7 Scope of the Project

This project is a power supply monitoring device that will trigger a buzzer when the mains supply cuts off and when it is resumed. At the same time, the light emitting diode will be turned ON. This device is helpful to inform the loss of power supply to some critical installation such as a pump in a fish tank and also to inform the user when the power is resumed. Once the buzzer sound, one will know that there is a loss of power supply and when the second alarm with different frequency sounds it indicates resumption of mains supply.


1.8 Project Work Organisation

The various stages involved in the development of this project have been properly put into five chapters to enhance comprehensive and concise reading. In this project thesis, the project is organized sequentially as follows:

  • Chapter one of this work is on the introduction to the study. In this chapter, the background, significance, objective limitation and problem of the study were discussed.
  • Chapter two is on literature review of this study. In this chapter, all the literature pertaining to this work was reviewed.
  • Chapter three is on design methodology. In this chapter all the method involved during the design and construction were discussed.
  • Chapter four is on testing analysis. All testing that result accurate functionality was analyzed.
  • Chapter five is on conclusion, recommendation and references.

Chapter Five


Conclusion and Recommendation

5.1 Conclusion

At the end of this work, the aim of the construction was achieved which is to design alarm circuit will alert you whenever there’s a power supply and power failure in the mains. In some special conditions it becomes imperative to know whether the mains that powers some important system or circuit is present or absent.


5.2 Recommendation

This project is designed to be used in homes and industries and wherever the need for an indication of power supply is needed. And should be used and maintain by a qualified personnel.


How To Get The Complete Material For Design And Construction Of A Power Failure And Resumption Alarm


Project Material Download

3,000 Naira


The Complete Material will be Sent to You in Just 2 Steps

Quick & Simple…


Step One Purchase

Make a Mobile Transfer or POS Payment of ₦3,000 to any of the Account Below

Access Bank PlcAccount No.: 0811003731
Name: Samphina Academy
Account Type: Current
Zenith BankAccount No.: 1225513212
Name: Samphina Academy
Account Type: Current

Or CLICK HERE To Pay With Debit Card

FOR CLIENTS OUTSIDE NIGERIA
CLICK HERE To Pay With Debit Card ($15)
GHANA – Make Payment of 80 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

Step Two Purchase

Send the Following Details on WhatsApp ( 08143831497) After Payment

  • Payment Details
  • Email Address 
  • Design And Construction Of A Power Failure And Resumption Alarm

The Complete Material Will Be Sent To Your Email Address After Receiving Your Details
T & C Apply


  Contact Our Help Desk


⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


Disclaimer


This research material “Design And Construction Of A Power Failure And Resumption Alarm” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “Design And Construction Of A Power Failure And Resumption Alarm” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.