Chapter One


Introduction

1.1 Background to the Study

Project delivery in the Nigeria construction industry is largely characterized by abandonment and delay at varied stages of completion. This pathetic situation is borne out of the construction of management in the industry on labour productivity thereby relegating to the background the importance of materials employed in job-execution.

The cost of materials constitutes 50-60% of the total cost of construction. The costs and value have a direct and blank- range effects on the overall cost and value of a building.

The word ‘’construction’’ is an all embracing term which covers works involved in the erection of buildings for various uses such as; private and public residential buildings for various uses such as; private and public residential buildings, commercial, industry, healthcare and recreation. It also covers all engineering works such as roads, bridges, dams, drainage’s and Sir fields e.t.c. the widespread of activities indicated a very high financial resource involvement. In 2005 alone, Nigeria spent ₦8.0 billion on the construction industry on non- residential buildings as reported by Ademoroti (2009). This figure accounted for 53.3% of the gross capital investment at current purchaser’s value at that time without doubt the construction industry is regarded as a highly capital intensive industry which requires a lot input which if not properly managed will result in great loss.

The very long process of construction procedure makes it more susceptible to losses and wastages. Starting from the process of construction, wastage abound.

The construction process which can be equated to the production process of the manufacturing industry takes place on the construction site, and is regarded as the most vital in the construction industry. This assertion is corroborated by Newcomb et al 2009 ‘’ At the heart of a construction organization is the building site. Therefore the construction production is the dominant process performed’’. Unlike other industries where factory processes are bored on clearly defined past practices and are often largely determined by fixed plant and machinery Seeley (2010).
Site management in the Nigeria construction industry has tended to be focused mainly on labour organization and productivity to the negligence of materials. However of the five resources that go into production process identified by ward (2011) are:

  1. Men (Labour)
  2. Materials
  3. Money (Capital)
  4. Machines (Equipment)

It is generally recognized that materials constitute a high percentage. This universal truth has been extracted by Wahab (2005) from 2009 United Nation Industrial development Organization (UNIDO) sponsored work report which revealed that building materials and components contribute between 50 and 60 percent of the total value of construction output. Based on this high figure, materials management should not be toyed with. On the other hand, an effective materials management will lead to a substantial cost savings and increased profitability to the client and the contractor respectively. A small percentage cut in materials wastage could bring about a sizeable increase in profit.

Waste come about in different forms on construction sites. example are waste from cut-off, bad storage, transportation e.t.c. Alabi (2011) asserted that if resources are used beyond a particular level in relation to the real values they are wasted. A much more detailed description of wastages by Skoles (2012) states that ‘’the general recognition that not all materials delivered to the construction sites are used for the purpose for which they are ordered and that builders frequently use more materials than those for which they receive payment. These materials are neither lost or are used in construction process in ways that are not recognized by estimators. These differences have never been clearly defined and are collectively referred to as waste’’.

Materials wastage on construction sites are often taken for granted. It should how ever be appreciated that whatever the degree of waste, it has a cost implication. A very serious case of wastage could result in colossal loss of profit to the contractor. As such construction firms wanting to survive in this very hard economic recession which has led to stiffer competition in rates quotation and tendering must place more emphasis on materials wastage control, as it will help to raise profitability.

In Nigeria, the very big projects are handled by the few foreign firm most especially heavy civil works, tall buildings e.t.c. while small and medium scale jobs such as school projects, housing estates and private residential developments, on all of these projects evidences of material wastage are seen in the form of heaps of unwanted materials, old and new, littering the sites.

The study is the focused on control of building materials on construction site and the possible causes of materials wastage on construction sites, and also the ways of controlling them with a view towards minimizing losses and at the same time improving the contractor’s profit margin.


1.2 Statement of the Problem

Wastage arises through such cases as damage, theft misuse, using incorrect material, negligence, in cutting and preparing, and over specification. Whatever the circumstances, the implication is a monetary loss arising from increased cost and quantity of material used as against the measured work, when losses or wastage become very severe, the result may be a complete loss of profit to the contractor.

For contractors to improve upon their profit margin and also reduce losses on scarce material resources. There is need for the established of effective control mechanism over materials all through material phases on construction projects. Not only does materials wastage reduce the profit level of the contractor, its adverse effect on construction works has also been linked to project delay and abandonment.

In the light of these shortcomings, improving material control on the sites.


1.3 Aims and Objectives

This project is aimed to examine the control of building materials on construction site to reduce materials wastage and correspondingly increase the contractor’s profit margin.

The objectives are;

  1. To determine and causes of materials wastage on construction site.
  2. To determine whether construction firms adhered to the use of inventory control forms.
  3. To determine an effective method for materials control construction site.
  4. To proffer solution to the materials on construction site.

1.4 Hypothesis.

Hypothesis I:-

To test whether or not there is a statistically significant relationship between the method of materials management policies / practice and the level of wastage experienced on construction sites.

Hypothesis II:-

To test whether there is a statistically significant relationship between wastage of materials on site and the mode of transport / delivery to construction site.

Hypothesis III:-

To test whether there is a statistically significant relationship between wastage of materials that will occur on site during usage of materials and type of construction activity.


1.5 Significant of Study.

Primarily project work titled ‘’Inventory Management – control of building materials on construction sites’’ is aimed at determining the factors leading to and contributing to wastages of materials and the inventory management practice on construction sites. Thereafter suggesting the ways of reducing such losses of materials resource.

Materials constitute a large percentage of all resources that goes into the physical development of buildings or other structures. These materials have cost implications, they are scarce just as well as money is scarce and should therefore be treated as well.

Construction processes by its very nature allow for wastages to occur, it is often prone to large scale waste if proper attention is not paid to materials both in handling and in storage. Since wastage is a loss in monetary terms, a large scale loss may result in complete loss of profit to contractor most especially in this present days of competitive tendering resulting in low percentage charges on profit and overheads.

Materials control is not a particularly new term to the construction firms, but the existence of the total concept of carrying out the control measures, observations, have shown that the operative especially and some supervisors exhibit a lot of indifference to the issue of wastage. Apart from the cost reduction effect it has on the contractor’s profits. It also constitute a menace to easy flow of work on site. There is greater risk of accident to operatives and other personnel on site and also plants hired tend to stay longer on sites due to delay, which may be experienced.

There is a need to check all the negative tendencies occasioned by wastage of materials on site. Whatever the source of the waste, a through control will bring about a reduction in the wastage and an ultimate increase in profit return.

Finally to realize such profit return, there is a need for a solid materials management policy put in place to check or guide against all sources of materials loss, and it is the responsibility of all private authorities to ensure that resources are utilized to an optimum level.


1.6 Scope and Limitation.

The general scope of this research covered some problems associated with materials wastage on construction sites and is restricted to minimizing wastage. It is limited to inventory control and accounting control of building materials. The materials referred to in the context of this paper is limited to those materials classified as required medium to much protection.

Only some common sources of wastage will be considered in the research work. And the basic traditional economic order models are considered as an inventory control model and no mathematical model will be applied. Material considered are the general types like cement, concrete block, plumbing material e.t.c.

Complete Material Available


The Control Of Building Materials On Construction Site To Reduce Materials Wastage And Correspondingly Increase The Contractor’s Profit Margin


Project Material Download

3,000 Naira


The complete material will be sent to you in just 2 steps.

Quick & Simple…


Step One Purchase

Make payment of ₦3,000: through USSD Transfer, Bank Mobile App, ATM Transfer, or POS Transfer to:

Access Bank PlcAccount No.: 0811003731
Name: Samphina Academy
Account Type: Current

Or Click Here to pay with Debit Card

FOR CLIENTS OUTSIDE NIGERIA:
Click Here to pay with Debit Card ($15)
GHANA – Make Payment of 60 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

  PAY WITH CRYPTOCURRENCY


Step Two Purchase

Send the following details through Text Message or WhatsApp Messenger | +234-8143831497

  • Payment Details 
  • Email Address 
  • The Control Of Building Materials On Construction Site To Reduce Materials Wastage And Correspondingly Increase The Contractor’s Profit Margin

The complete material will be sent to your email address after receiving your payment information | T & C Apply


  Contact Our Help Desk


You may also like:

⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


The Control Of Building Materials On Construction Site To Reduce Materials Wastage And Correspondingly Increase The Contractor’s Profit Margin


Disclaimer

This research material “The Control Of Building Materials On Construction Site To Reduce Materials Wastage And Correspondingly Increase The Contractor’s Profit Margin” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “The Control Of Building Materials On Construction Site To Reduce Materials Wastage And Correspondingly Increase The Contractor’s Profit Margin” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.


How to defend your research work


This is a general guide on how to defend your research work:

1. Prepare For Questions:

If you are preparing for questions that may be asked during your defense, then your answers will flow smoothly and effectively. This will prove your knowledge on the subject e.g “The Control Of Building Materials On Construction Site To Reduce Materials Wastage And Correspondingly Increase The Contractor’s Profit Margin“, and strengthening your argument. Ask friends and family, read your work for them to listen to your presentation, and write down questions. You may be lucky the panel will ask you those you have already prepared on.

2. Strong Summary:

Summarizing your chapters will help keep your audience focused because it is easy for a mind to drift, so providing summaries will ensure your panel will follow along, even if they lose focus for a brief moment. Visual aides, such as graphs and power-point presentations can be very helpful. If you are going to use these, make sure you will practice your presentation with them.

3. Be Confident in Your Research Work:

Not knowing your topic “The Control Of Building Materials On Construction Site To Reduce Materials Wastage And Correspondingly Increase The Contractor’s Profit Margin” inside out will cause you to struggle and ultimately fail with your defense. You need to know the subject from every angle to ensure you are fully prepared for any question that may come your way.

4. Conclusion:

Reinforce your findings to conclude your defense. The finale of your presentation should focus on proving the work that has been done. You may need to recap on what has changed and remained unchanged, if is necessary.

5 . Listen:

Before you get defensive or recite a particular answer, make sure you truly understand the question being asked. Being a good listener is an important quality, because providing an inaccurate or off-topic answer will also weaken the validity of your paper.


Chapter Four


Conclusion and Recommendations

4.0 Conclusion

This study has from the analysis of the field survey that:-

  1. Wastage of materials will occur during the transportation / deliver of material to construction site or within the site which is 6.73%
  2. Wastages of materials will occur during storage of materials which is 12.79%
  3. Wastage of materials will occur on construction sites during usage of material / construction which is 80.79%
  4. That most construction firms failed to adopted the use of the necessary control forms like delivery notes, material transfer notes sites.
  5. Material wastage level decrease with the increase in size of construction firms. Large firms record lower level of materials wastage in relation to their small counterparts.
  6. Wastage level is highest during the construction / usage (80.79) of the material phases followed by storage (12.73%) and the least being during the transportation / delivery (6.73%) stage.
  7. Wastage allowance being used by firms in Nigeria today are effective of our situation and a bit different from those of the British standard.
  8. In most cases, it is the contractor that bears the loss resulting from wastage of materials except in labour only contractors. Where the responsibility of importing materials to site is bore by the client or the client’s agent.
  9. That the application of the traditional EOQ model is questionable because of it’s limitation and sweeping assumption which are not practicable on Nigeria construction sites.

4.1 Recommendation

On the basic of the representation made in this study, the following recommendation are made;

  1. A good construction waste management system is vital for the industry. This achievable through the development of good policies and implementation for any size of construction firm. Consciousness on the part of site operatives to wastes in their daily operations is essential
  2. In order to curb criminal waste, preventive rather than crime detection is recommended such as:
    • Provision of durable fence around the entire site
    • Employing competent and trusted day and night guards
    • Locating site office at strategic position
    • Double – checking materials on delivery
  3. Schedule of materials should be prepared based on each operating using tender documents. Regular checks should be carried out on estimates and quantity employed.
  4. There should be a proper co-ordination or communication between the site and the office on suitability of materials in order to prevent future deficiency.
  5. Site accounting system described in section of the literature review should be incorporated the waste accounting system described in section of the literature review should be incorporated the waste control operation of construction firms, as it helps the contractors;
    • Detect material wastage level immediately at the construction site so that remedial measures or action can be taken quickly
    • Provide valuable data on which to bore future estimate of likely material on contract.
  6. A material inventory control model should be formed for the construction industry so that effective control of material can be carried out to prevent excessive materials on site to reduce wastage.
  7. Wastage reduction management (resources management) should be incorporated into course study of building and civil engineering students in the polytechnic and universities
  8. Finally, the person directly in-charge of constructor site should be responsible for the control of material wastage

In an effort to be self reliant and self sufficient in building materials, the government also have a part to play by adopting the following measures:

  1. Federal Government should, as a matter of priority equip the Itakpe oil field 80 that the Associated Iron ore company Ltd can cater for the needs of Aladja and Ajaokuta steel plants. This will remove the problem of foreign exchange the steel plants and rolling mills can produce flat sheets (for roofing) rods, pipes and structural steel.
  2. Government should encourage private entrepreneurs to set up more timber estates with factories for making doors. Plywood’s furniture e.t.c in all the rain forest.
  3. Government through its mining corporation should explore the possibility of mining and smelting zinc and aluminum.
  4. Government should re-organize the roads, building materials research institute and this should be affiliated to two or three universities based on the principle of natural habitat for instance, university of Benin could be given the Timber Research centre and Unijos can be designated as a centre for research into tin, zinc e.t.c.
  5. Contractors must make optimal one of Buyers or purchasing managers in their employment. This they can do by giving them free hand to exhibit their skills.
  6. The Nigerian institute of Building should recommend to the N.B.T.E and the N.U.C that the polytechnic and universities which courses in building should introduce option in materials science and technology.
  7. As a start to looking inwards and attaining self reliance rapidly, our architects must hence forth specify locally produced materials.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.