Construction Of Automatic Change Over With Generator Trip Off

Project and Seminar Material For Electrical Electronics Engineering EEE

Project and Seminar Material For Electrical Electronics Engineering EEE


Abstract


As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually to every thing they do.

A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after 40 seconds with out going through the point for manual operation. This project writing were organized in according way for easy understanding


Chapter One


1.0 Introduction

This project is on the design and implementation of automatic change over and how it can be used to change from one power sources to the other automatically. The design comprises some arrangement that senses the power failure form either of the power sources and drives the electro mechanical switching device (relay) that is capable of changing two poles (live and neutral) to give out light or be on stand by to generator side.


1.1 Background

As technological advancement has been on the increase in our society many have fallen in love with technology and wants to have a feel of modern technology in virtually to every thing they do.

A design have been made in combination of electrical and electronics to change over from one power sources to the other automatically without many operation.

Electronic components such as relay transformer diodes were used thereby making the project less expensive for the implementation of the project and commercial application.

Moreso the cost suitability and availability of the required components for the project circuitry were some of the major factors considered by the designer


1.2 Aim / Objectives

To design a circuit that will automatically change over from main power supply (PHC) to power generating set and vice versa with the help of electro mechanically switching device that is being controlled by electronics component


1.3 Scope / Significance

This project design can be used to transfer power sources to the other automatically. The design could also be used in other application apart from changing power sources once there is a well though arrangement


1.4 Project Report Organization

The project report has been organized into five chapters for orderliness and easy understanding of the information on the report design.

  • Chapter one contains introduction design objectives/aim scope/significance of the report and report organization
  • Chapter two dealt on system component analysis literature review and theories/modules of design.
  • Chapter three contains the system design description of the system building blocks system specification block diagram and the description of the overall operation of the system.
  • Chapter four describes the implementation testing and results of the project.
  • Chapter five finally dealt on the cost analysis calculation and recommendation for further improvement and ended with a page for references.

Construction Of Automatic Change Over With Generator Trip Off


Project Material Download

3,000 Naira


The complete material will be sent to you in just 2 steps.

Quick & Simple…


Step One Purchase

Make payment of ₦3,000: through USSD Transfer, Bank Mobile App, ATM Transfer, or POS Transfer to:

Access Bank PlcAccount No.: 0811003731
Name: Samphina Academy
Account Type: Current

Or Click Here to pay with Debit Card

FOR CLIENTS OUTSIDE NIGERIA:
Click Here to pay with Debit Card ($15)
GHANA – Make Payment of 60 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

  PAY WITH CRYPTOCURRENCY


Step Two Purchase

Send the following details through Text Message or WhatsApp Messenger | +234-8143831497

  • Payment Details 
  • Email Address 
  • Construction Of Automatic Change Over With Generator Trip Off

The complete material will be sent to your email address after receiving your payment information | T & C Apply


  Contact Our Help Desk


You may also like:

⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


Disclaimer


This research material “Construction Of Automatic Change Over With Generator Trip Off” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “Construction Of Automatic Change Over With Generator Trip Off” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.