This research examined the consequences of incompatible land uses on the environment of Uyo Urban. The study adopted a survey approach. It was carried out with questionnaire administration, land uses, structures and sector survey. Random sampling of 748 household heads within the identified 6 residential zones in Uyo Urban was adopted. The residential areas were demarcated following routes within Uyo urban. Data were collected from related government ministries and departments as well as other secondary sources. The data collected were analyzed using simple descriptive statistical methods. Findings from the study revealed that the incompatible level of rural-urban migration is negative as commercial land uses mostly interfere with residential units and mostly houses adhering to land use standards and owing such as economic and personal drive.

Consequently, there is the incompatibility problems witnessed in the city as manifested in environmental pollution, high residential traffic, overcrowding, pressure infrastructural facilities and social amenities. These developments have impacted on health and urban sustainability in the area. Recommendations were proffered to guide the policy makers toward enhancing adherence to level of zoning guidelines, housing conditions and general environmental conditions of the study area. These will help to achieve a healthy, livable, prosperous and sustainable human settlement for the area. The recommendations include the provision of land use plan, enactment of zoning, building to approve building plan, development control by authorities involved and using approved standards for any land use development and public enlightenment campaign on built environment and related issues.


Table Of Contents


Preliminary Page(s)

  • Title page
  • Certification page
  • Dedication
  • Acknowledgement
  • Abstract
  • Table of content

Chapter One

Introduction

  • 1.1 Background to the study
  • 1.2 Statement of problems
  • 1.3 Aim and objectives
  • 1.4 Objectives of the study
  • 1.5 Significance of the study
  • 1.6 Scope
  • 1.7 Limitations of the study

Chapter Two

Literature Review

  • 2.1 The Concept of Development
  • 2.2 The Concept of Land
  • 2.3 Land-use planning in Nigeria
  • 2.4 Significance of the land use act of 1978 to land-use planning in Nigeria
  • 2.5 Incompatible Land Uses

Chapter Three

Research Methodology

  • 3.1 Research design
  • 3.2 Area of study
  • 3.3 Sources of Data
  • 3.4 Population and sampling of the study
  • 3.5 Instrumentation
  • 3.6 Method of data analysis

Chapter Four

Data Presentation And Analysis

  • Results

Chapter Five

Conclusion And Recommendations

  • References
  • Appendix

Chapter One


Introduction

1.1 Background To The Study

Irregular and unsound urban development is the common problem of all urban settlements today. The increasing continuation of this problem is inevitable in this order, where the economy-ecology balance is not taken into consideration and economic concerns always win (Cengiz 2013)

In contemporary physical planning literature, the term land use refers to the use to which a site, plot or building is put, it may be residential, commercial, industrial, public, recreational, agricultural or transportation (Obateru 2005)

Urban growth, the density of which is continuing increasingly with the population increase that has taken place in urban areas in the recent years, leads to the vanishing of an extremely limited number of natural resources and to the occurrence of irregular and unsound urban areas, along with impairing the agricultural lands (Brueckner et al., 2001).

When considered from another perspective, it might be stated that urbanization gained momentum with the industrial revolution. When urbanization and industrialization are evaluated together in this context, it follows that the share of industrialization in the concentration of the population in urban areas and in the environmental pressure it creates is a fact which cannot be ignored (Aksu, 2011).

The technological development, the population increase and the rapid change in cities that particularly occurred upon the industrial revolution have upset the ecological balance; consequently, the process of rapid degradation of natural resources commenced. Having continued with a gradual increase in the need for new living spaces and areas of use, this process of degradation has substantially altered the working of the ecosystem with either conscious or unconscious planning.

It is impossible to make up for the natural resources which have been used up due to the degraded ecosystem; furthermore, the vital impacts of this process are increasing day by day. The cities and industrial areas (technoecosystems) which continue to develop on natural areas especially due to the shortcomings/mistakes in city planning are striking as one of the most important results of this situation, Beinat, (1998)

In order for urban-industrial formations to survive on the earth with limited resources, it is imperative that they be made more compatible with the natural ecosystem than that of today and that an other which benefits both parties be created without the impairment of the working of the ecosystem (Odum and Barrett, 2008).

Considering the principle of integration of the urban landcape with the natural ecosystem, this study dwells on the impacts of improper use due to wrong urban development on the natural environment and the concept of ecological landscape planning. Within this scope, the subjects “Incompatible Land Use, Planning and the Planning Hierarchy in Uyo, Ecological/ Environmentally-Sensitive Landscape planning and its Importance were included in the study.

was made, and the legal and administrative gaps in the improper use of the land were investigated thoroughly. Accordingly, the reasons for, the consequences of and the solutions to improper land uses frequently taking place in urban area planning were discussed.

The importance attached, and the priority given, to the environment and to urban ecological planning varies by society. Furthermore, it is possible to see the variations in the perspectives of the environment at various stages. Urban development is defined with the increase in production and consumption following the industrial revolution with the assumption that the natural resources were endless and with intensive construction activities. This stage involves some extravagant energy and land use at this stage. The growth of the city against agricultural lands is regarded as an essential indication of development (Eke, 2000).

Especially the process of metropolitanization causes cities to grow rapidly in the space and sprawl over extensive areas and to predominate, economically and socially, in all surrounding urban and rural communities. As a result of this, the natural resources remaining within the metropolitan area enter the process of being used up rapidly. This manifests itself with the unplanned and uncontrolled growth particularly against the rapid population increase in the metropolises of developing countries (Sezgin and Varol, 2012).

By the phenomenon of urbanization which appeared in this process of growth, the sprawl of cities, the absolute necessity for establishing new settlements and the fact that urban lands could easily be turned into a matter of speculation resulted in the rapid including of fertile agricultural lands in urban lands (Keles and Hamamci, 1993).

The rapid decrease in agricultural lands upon rapid urbanization and industrialization is a phenomenon which is observed worldwide besides in our country. The construction activities of industrial establishments, roads which are their infrastructure, sports facilities and entertainment centers take place in fertile agricultural lands generally with the justification that they bring fewer economic losses (Cepel, 2008).

The reasons for improper use, meaning the use of agricultural land for nonagricultural purposes, included the gradual increase in urbanization, the rapidly developing industry and investments accordingly, and finally, the gaps in laws and regulations. The economic earnings that develop depending on the construction of houses in rapidly growing areas where urban development is intensively felt are always higher and less risky than the yield of the activities to be carried out in agricultural lands, which manifests itself as the most primary reason why such areas are preferred as urban settlements.

In this way, urbanization, one of the most serious threats for the world’s biodiversity, most dramatically and permanently alters land use in our country, as it does worldwide (Ricketts and Imhoff, 2003; Yli-Pelkonen and Niemel &, 2006). Upon the industrial branch which developed afterwards, the identification of these lands, which continued to exist as urban development areas, as area convenient for any nonagricultural investment and their use for these purpose were supported. Since no laws or regulations to prevent all these things and to protect fertile agricultural lands have been made or since, even if they have been made, they lack the necessary restrictions, the improper use of fertile agricultural lands continues as a great national problem. With a wide variety of definitions, planning is an integrated system which involves a series of chaotic cases in theory and practice and which depends on various laws and regulations besides being a multidirectional and comprehensive concept. According to the definition by Keles (1972), planning also involves the absolute necessity for the rational use of the available resources and information. The process of preparation of the series of decisions aiming at attaining the targets which have been specified regarding the activities to take place in the future as a whole via the optimum means is called planning (Akay, 2009).

Article 166 of the 1982 Constitution is entitled “Planning” and assigns the state the task of planning which ensures “economic, social and cultural development, particularly the rapid development of industry and agriculture at the national level in a balanced and compatible way, and the efficient use of national resources by making their inventory and evaluation”.

There are numerous laws, statutes, regulations and circulars which direct development in our country, with the most determinative one being the Development Law No. 3194 and the regulations affiliated to it. Depending on the variety of the objects intended to be planned, a large number of types of plans are encountered in the development law. Some of these types of plans were organized in the Development Law No. 3194, while some of them were left to Article 4 of the law and the regulations to be made with special laws. It is possible to classify the plans which arise from the provisions of the Development Law as “types of plans for general purpose” and the plans which are for special purposes and which are envisaged for the areas that are the subject of a different planning regime as “types of plans for special purpose” (Table 1) (Erdem and Coskun, 2009). Of the following types of plans, Upper-Scale Plans, the Physical Plan of the country, the Regional Plan and the Land Use Plan are types of socio-economic and ecological plans, while the remaining plans are called “types of physical plans”.

Even though most of the above-mentioned types of plans are in some way contained in the law, the majority are the types of plans with no implementation in practice. In Article 6, entitled “The Planning Hierarchy”, of the second section entitled “Fundamental Principles on Development Plans” in the Development Law No. 3194 that was shaped with an understanding which was extremely far from conserving the natural resources and that was primarily organized in order to ensure the shaping of urban living spaces, it is laid down that “plan are prepared as “Regional Plans” in terms of the area they cover and their purposes, whereas development plans are prepared as “Master Plans” and” Implementation Development Plans”. In other words, spatial plans are collected in two main ranks as Upper-Scale Plans (the Regional Plan} and Lower-Scale Plans (Development Plans}, although not clearly defined in the law. Development plans are subdivided into two as “the Master Plan” and “the Implementation Development Plan”. Another type of plan included in Article 5 of the law, entitled “Definitions”, is “the Environmental Order Plan”. This type of plan should again be regarded as an upper-scale plan type both owing to the content provided in the definition and because it isw not included in the definition of “Development Plans”. In conclusion, when the related articles of the Development Law are evaluated together, it is possible to speak of three main plan ranks, namely Regional Plans, Environmental Order Plans and Development Plans, although not defined systematically (Erosy, 2006).

The types of plans and their definitions which are contained in the law are as follows (Ercoskun et al., 2004; Erdem and Coskun, 2009; Demirel, 2010; Demirel, 2010; the Ministry of Environment and City Planning, 2010)


1.2 Statement Of Problems

It has been noticed that, there are problems associated with incompatible land uses in central business district (CBD) in most urban areas. These include untidy confusion, high population rate, traffic congestion as a result of a mixture of incompatible uses to which land has been subjected. To these categories of problems are very common, in most urban area where many activities such as commercial and services activities from, residential, industrialization and recreational location are been found. The above stated problems have given rise to the government to enforce zoning regulation especially at the core areas of our cities.

Despite this, the incompatible uses still continue to exist in the CBD areas. For this reason, this project research work intends to provide answers to some relevant question such as;

  1. What are the existing land uses in the study area?
  2. What are the problems emanating from the distribution of land uses in the study area?

1.3 Aim And Objectives

The aim of this study is to examine the effect of incompatible land uses in Uyo urban landscape (i.e central businesses district of Uyo capital city of Akwa Ibom State).


1.4 Objectives Of The Study

To achieve the broad goal, the following objectives are set up:

  1. To examine and identify the incompatibility land uses in Uyo metropolis.
  2. To assess the existing land use pattern in Uyo metropolis .
  3. To assess the effect of incompatibility in the study area
  4. To determine government efforts to control those problems emanating from the incompatible land use

1.5 Significance Of The Study

This will contribute to knowledge by discovering new challenges stakeholders faces in controlling and socio-economic development in urban centers in growing cities and also serves as a reference material for future research.
The findings of this study will help contribute to good management practice in the public institutions charged with the responsibility of controlling socio-economic developments in the country. This is because the study attempts to explore the problems associated with housing Urban and regional planning and recommends actions to be taken for its effectiveness.

Furthermore, the findings will create awareness of stakeholders on the current state of socio-economic developments and their effect on the urban environment and people. This will aid ensure adequate measures are put in place to prevent further developments of the situations where buildings in urban areas uncontrolled. The implementation of findings of this research will also lead to improvement in urban socio-economic development and management as well as related issues in Nigeria as a whole.


1.6 Scope

The study focuses on the consequences of incompatible land uses on the environment. The study used Uyo metropolis, Akwa Ibom state as the case study.


1.7 Limitations Of The Study

The study was limited by two major factors; financial constraint and time. Insufficient fund and time tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Chapter Five


Conclusion and Recommendations

This study has investigated the consequences of incompatible land uses on the environment in Uyo Metropolis. The study concludes that wrong estimate by the promoters of the project, inflation, inadequate finance, dispute/legal tussle over ownership of the plot and inadequate funding are some of the significant causes of incompatible land in Uyo. Others are an incompetent project manager, death of the project owner, natural disaster and political factor. The study also concluded that abandoned structure adversely affects the sales price or property value of properties nearby. Clusters of incompatible land will lead to a blighted neighborhood, also reducing the aesthetics of the neighborhood.

The leading causes of abandonment of project were a wrong estimate, Inadequate land Planning, inflation, etc. which means that promoters of building project did not commission a study into the feasibility and viability of such projects. Therefore, project promoters should commission feasibility and viability studies to be conducted as it reduces the wastages of more significant resources, in the long term. Also, the government can establish a National Construction Bank to help revive incompatible land.


Consequences Of Incompatible Land Uses On The Environment


Project Material Download

3,000 Naira


The complete material will be sent to you in just 2 steps.

Quick & Simple…


Step One Purchase

Make payment of ₦3,000: through USSD Transfer, Bank Mobile App, ATM Transfer, or POS Transfer to:

Access Bank PlcAccount No.: 0811003731
Name: Samphina Academy
Account Type: Current

Or Click Here to pay with Debit Card

FOR CLIENTS OUTSIDE NIGERIA:
Click Here to pay with Debit Card ($15)
GHANA – Make Payment of 60 GHS to MTN MoMo, 0553978005, Douglas Osabutey 

  PAY WITH CRYPTOCURRENCY


Step Two Purchase

Send the following details through Text Message or WhatsApp Messenger | +234-8143831497

  • Payment Details 
  • Email Address 
  • Consequences Of Incompatible Land Uses On The Environment

The complete material will be sent to your email address after receiving your payment information | T & C Apply


  Contact Our Help Desk


You may also like:

⚠️ Need a different topic? Perform a quick search



Get A Complete Business Plan For Any Business In Nigeria

Business Plan for Businesses in Nigeria

  Business Plans in Nigeria


Disclaimer


This research material “Consequences Of Incompatible Land Uses On The Environment” is for research purposes and should be used as a guide in developing your research project / seminar work. For no reason should you copy word for word (verbatim) as samphina.com.ng will not be liable for any who copied the material.

The aim of providing this material is to reduce the stress of moving from one school library to another all in the name of searching for research materials. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works. According to Austin Kleon “All creative work builds on what came before”.

samphina.com.ng is only providing this material “Consequences Of Incompatible Land Uses On The Environment” as a reference for your research. The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own research. Use it as a guidance purpose only.

Samphina Academy

Samphina Academy is an Online Educational Resource Center that is aimed at providing students with quality information and materials to aid them in succeeding in their academic pursuit.