Abstract
This research work has seriously analyzed procurement reforms act as tool for cost savings and accountability MKRPIC. Where the data was collected and used for the compilation of this research. An introduction was made which comprises the statement of general problem, the background of the subject matter, objectives of the study and the significance of the study.
Existing literature on procurement reforms act, determination of needs, some purchasing objectives, purchasing practice and techniques, some management function were also discussed and reviewed. Random Sampling method was used as the basis of this study.
A sample size of 39 out of total populations of 130 was selected. The research work shows that procurement reforms act n KRPC is always influenced or rather ineffective. The study recommends that due process should be complied with in order to enhance cost savings and accountability in KRPC. Also total commitment of the entire staff of KRPC.
Chapter One
Introduction
In the past, huge sums of government money have been siphoned through the processes of contract awards. A major thrust of this administration therefore, is the acceptance of Procurement Reforms Act as a tool for embracing transparency, competition, fairness, integrity, openness and value for money in the procurement reforms Act and seek the support of all governance for the implementation of the scheme in various ministries and government parastatals.
The researcher intends to analyze on procurement reforms Act as a tool for cost savings and accountability in Kaduna Refining Petrochemical Company (KRPC) considering the several abuses to rules and standards in the award and execution of contracts. These abuses are in the form of over-invoicing, inflation of contract costs, proliferation of white elephant projects, poor project delivery, overpayment as well as manipulations of the processes leading to the award of contracts.
The Kaduna Refining and Petrochemical Company is in the business of refining Crude oil into valuable petroleum and petrochemical products and manufacturing and packaging products efficiently. And the way and manner in which procurement practices are carried out is of great concern to the researcher.
The edifice is a process plant designed to run steadily with minimum operating costs so as to make profit. In order to achieve this notable objective, it is imperative that replenishment drives are made to ensure that operational spare parts are readily available in the warehouse.
Since over seventy percent (70%) of the company’s expenditure is in the area of materials procurement. It is with this realization in mind that several efforts have been made by both corporate and the subsidiaries management to control and regulate materials management activities, especially in the area of procurement of materials in order to save cost and enhance company’s operations. In this project the terms procurement and purchasing would be used interchangeably.
1.1 Background of the Study
The researcher developed interest to write on this topic because of personal interest in procurement reforms act and persona interaction with some staff who work in the procurement department under the umbrella of material management department (MMD) in Kaduna Refining and Petrochemical Company (KRPC).
The researcher got an insight into the procurement activities of the company the company and the problems facing them and therefore feels that it would be of great benefit to the company to conduct a detailed study into its purchasing departments with the aim of identifying the problems and after necessary suggestions toward the solution of such problems for effective and efficient operations of the company, Kaduna Refining and Petrochemical Company (KRPC).
1.2 Statement of the Problem
The Material Management Department (MM) of the KRPC Ltd operates in an integrated form to make materials available in the warehouses because the spare parts are stored.
“JUST IN CASE” for timely maintenance intervention or as the need may arise.
However, KRPC has taken a back seat in the implementation of the provisions of the Procurement Refining Act. Also, the statement of the general problem is the non-adoption of the Procurement Refining Act in KRPC Ltd.
And over the years there have been incessant cases where critical material needed for maintenance intervention and other requests, are either over-stocked, under-stocked or out of stock. The scenario depicts the existence of procurement deficiencies in the area of planning, replenishing, coding and inventory control which affects plant sustainability in KRPC Ltd. Besides 2008 annual stock taking in KRPC revealed the available materials to the value of N8 billion which could be used for other purposes.
1.3 Objectives of the Study
The study is geared towards achieving the following objectives:
- Outline the risks associated with non-implementation of the provisions of the procurement Act in KRPC Ltd.
- Determine the impact of the non-implementation of Procurement Reforms Act to the organization.
- Examine the factors responsible for the non-implementation of the Act in KRP Ltd.
- Suggest or proffer solutions to the problems.
1.4 Significance of the study
The benefits derivable under this study can be seen below:
- It serves as a guide for the organization in which the researcher as chosen as a case study i.e. KRPC.
- It is meant for students for are willing to embark on further studies in this perspective.
- It is a prerequisite for an award of Higher National Diploma (HND) in purchasing and supply.
1.5 Scope of the Study
The scope of this research work shall be limited to Kaduna Refining and Petrochemical Company particularly the department under the umbrella of material management department.
The researcher also aimed at analyzing the procurement reform act as a tool for cost savings and accountability in KRPC.
Also, comparative notes shall be made where necessary with other department within KRPC.
1.6 Research Questions
- What are the risks associated with the non-implementation of Procurement Reforms Act in KRPC?
- How does the non-implementation of the Procurement At affect the organization?
- iWhat are the factors responsible for the non-implementation of the Procurement Reform Act?
- What are the remedies for solving these problems?
1.7 Definition of Terms
Procurement:
Means purchasing and/or supplies.
Supplier:
This is the term used to describe a seller of goods or items in a given place.
Inventory:
This refers to the list of goods or items in a given place.
Quotation:
Is a list showing the prices of items.
Purchase Order:
It is an order in a printed firm to transmit the company’s requirement to supplies.
Negotiation:
Is a term used to arrive at a final and reasonable price.
Specification:
This is the information by the buyer to supplier indicating descriptions dimension and analysis performance of a product.
Public Procurement:
Means the acquisition by means of goods, works or services.
Efficiency:
Means the ability to minimize the use of resources in achieving organization’s objectives i.e. doing the right thing.
Effective:
Means producing the result that is wanted or intended.
Due Process:
Is a mechanism for ensuring strict compliance to rules and procedures that should guide contract award.
BMPIU:
Budget Monitoring and Price Intelligent Unit. This is the unit tasked with implementing Nigeria’s public procurement reform programmes.
Chapter Five
Discussions, Conclusion, Summary and Recommendations
This chapter summarizes the entire work to bring out the findings, arrive at a conclusion and make feasible recommendations to management.
5.1 Summary of Procedure
Arising from data analysis, non implementation of procurement reform act and its deficiencies were identified, them effects, consequences the factors contributing to the non implementation of the system and the strategies for resolving these problem were addressed especially the issues of planning, monitory, replenishment, cost saving and accountability the findings of this study are that:
- Replenishment drive is ineffective
- Understanding exist
- Communication gap exist
- Materials requirement planning is ineffective
- Subjectivity or persona interest exist
- Good working culture is lacking staff training adequate lack of professionalism;
- Ineffective computerization.
5.2 Discussion of Findings
The onus or duty of making materials available in KRPC and to monitor their movement lies with procurement and stock control department. However, over the years this function has not been performed adequately resulting in cases of understocking, stockout and even obsolesce. Thus, Udoh (1997) reported that due to irregular and unreliable supply of Desorbent, the NNPC lost up to N1.67 billion (expressed in 1996 naira values) in directly collectible revenue from loss of Linerar Aikly/Benzee (LAB) Sales alone.
5.3 Conclusion
In the light of the above findings, the following conclusions are made first, normal replenishment should be encouraged to eliminate emergency purchases, secondly, procurement of material should be strict done on the basis of procurement reforms act. In addition, inventory control unit is imperative if the organization is to ensure cost savings and accountability.
Moreover, the provision of sufficient and modern working tool slice computers and internet facility are not less significant. The level of skills of procurement staff must be enhanced through sufficient training and professionalism.
5.4 Implications of the Findings
The outcome of this study attests to the fact that non implementation of procurement reform act contributes to lack of material required, low cost savings and accountability to enhance the company in the following ways; strategic buying is not observed, inventory control is not done at all and so material purchasing department and the stock control department under the umbrella of material management department (MMD) normal replenishment is overshadowed by emergency purchases because the purchase request status are not raise in time and if raise are affected by long procurement cycle, material are not planned for to guarantee availability and cost effectiveness, accountability and understaffing as wee as working culture all influence the efficiency of procurement reform act as a tool for cost savings and accountability in KRPC.
5.5 Recommendations
Arising from the above findings and conclusion, it is recommended that the management of KRPC should:
- Enhance an sustain replenishment drives to discourage emergency purchase which deplete revenue base and or cost savings.
- Encourage the use of annual materials to avoid understocking or overstocking.
- Establishment inventory control unit to monitor material in the system.
- Provide desirable adequate and modern working tools for utmost performance.
- Complete the computerization exercise so that all MMD transactions would be done online.
5.6 Suggestions for Further Studies
During the course of this research, the researcher came across some interesting areas that require further study.
However, the scope of this study with not allow the researcher to delve into this areas. In the light of this, the researcher is recommending that further study should be undertaken into the following areas:
- Tendering: Is the presentation of terms and conditions of contract before execution.
- Roles of Procurement Units: Is responsible for the procurement of goods, services ad works.
- The Due Process Compliance, Review and Certification Process: This commences the review process by assigning the task to the designated term within the unit.


The Complete Material Will Be Sent to You in Just 2 Steps
Quick & Simple…
![]()
Make Payment (Through Transfer) of ₦5,000 to the Account Below
![]() | Acc No: 0811003731 |
| Samphina Academy | |
| Current Account |
Or CLICK HERE To Pay With Debit Card
| FOR STUDENTS OUTSIDE NIGERIA | |
| CLICK HERE To Pay With Card ($15) | |
| FOR GHANA STUDENTS (GHS 100) | |
![]() | MTN MoMo |
| 0553978005 | |
| Douglas Osabutey | |
![]()
Send the Following Details on WhatsApp ( 07062590260 ) After Payment
- Payment Details
- TOPIC: An Analysis Of The Procurement Reforms Act As A Tool For Cost Savings And Accountability
The Complete Material Will Be Sent To You On WhatsApp After Receiving Your Details
T & C Apply
Students Review
List of Related Works
An Analysis Of The Procurement Reforms Act As A Tool For Cost Savings And Accountability In NNPC
The Efficacy Of Interate Rate Deregulation On Savings Mobilization In The Nigerian Economy
Determinants Of Savings In Nigeria
Effect Of Bank Charges On Customer Saving Culture: A Case Study Of Union Bank Plc
The Efficacy Of Interest Rate Deregulation On Savings Mobilization In The Nigerian Economy
Effects Of Interest Rates On Savings And Investment In The Nigerian Economy
The Role Of Nigeria Money Market In Savings Mobilization
Effect Of Bank Distress On Rural Savings Mobilization Of Banks
Impact Of Savings On Financial Development In Nigeria
Analysis Of Savings And Investment Strategies Among Cassava Processors
Efficient And Reliability Savings Account
Savings Mobilization For Economic Development In Nigeria Banking Industry
Effect Of Inflation On Saving And Economic Growth Of Nigeria
The Impact Of Monetary Policy On Savings Mobilization In Nigeria
Impact Of Savings On Financial Development Of Nigeria
Automated Loan Lending Management System Using Akwa Savings And Loans, Ikot Ekpene As A Case Study
Factors That Reduce Savings In Nigeria
Mobilization Of Domestic Savings For Economic Growth And Development In The Banking Industry
Computer Based Savings Account System
Purchasing As A Cost Saving Function In A Manufacturing Company
The Impact Of Public Procurement Act On The Procurement Process In Nigeria Public Sector
Challenges Affecting Procurement Processes In Public Organizations In Nigeria
Evaluating The Challenges Of Public Procurement In The Nigeria Court Sector
Adoption Of E-Procurement Systems In Developing Countries: A Nigerian Public Sector Perspective
Design And Implementation Of A Computerized Drug Procurement And Distribution Tracking System
The Impact Of Cost Reimbursement As A Procurement System On Construction Projects
Impact Of Wrong Selection Of Procurement Method In Nigeria Construction Industry
Use Of Tendering And Competitive Bidding In Public Sector Procurement
Impact Of Wrong Selection Of Procurement Method In Nigeria Construction Industry
Application Of Due Process In Existing Procurement Methods In Nigeria
An Analysis Of The Procurement Reforms Act As A Tool For Cost Savings And Accountability In KRPC
The Procurement Practice In The Pubic Sector Economy; Problem And Prospects
The Effects Of Accountability And Transparency In Financial Management Of Nigerian Local Government
Accountability In Local Government Administration (A Case Of Ngor Okpala L.G.A.)
Crime Control Through Auditing And Accountability In The National Drug Agency
Effective Accountability And Transparency In Financial Management In Local Government
Accountability Concepts Application And Public Sector Accountability
Enhancing Financial Accountability In Small And Medium Scale Enterprises
Impact Of Accountability On Public Sector Financial Management In Nigeria